• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
SI Haitao, ZHAO Jiechao, ZHANG Chao, LI Ke. Analysis of Mechanized Coal-gangue Separation Backfill Mining Technology in Underground Mine and Its Application[J]. Safety in Coal Mines, 2017, 48(9): 141-144.
Citation: SI Haitao, ZHAO Jiechao, ZHANG Chao, LI Ke. Analysis of Mechanized Coal-gangue Separation Backfill Mining Technology in Underground Mine and Its Application[J]. Safety in Coal Mines, 2017, 48(9): 141-144.

Analysis of Mechanized Coal-gangue Separation Backfill Mining Technology in Underground Mine and Its Application

More Information
  • Published Date: September 19, 2017
  • Integrated technology of fully mechanized backfill mining and raw coal separation in underground coal mine is used to solve the problems of too high content of gangue in raw coal and repeated transportation of waste rock packing and subsidence during the process of mining thin seam. The paper systematically stated the system layout of the raw coal separation and backfill mining integrated technology, the operational mechanism of coal and gangue separation system, backfill and coal mining system were analyzed respectively, the key factors restricting the effect of backfilling and its control measures were got as well. The results of application show that after coal and gangue separated from raw coal are transported to coal bunker and goaf respectively, which brings huge economic, social and environmental benefits by reducing the ash content of raw coal from 70% to 25%, avoiding the repeated transportation of gangue, optimizing the backfilling system, controlling the surface subsidence effectively, selecting about 30 000 tons coal from waste rocks and saving transportation costs about 4.05 million in one workplace every year.
  • [1]
    张吉雄,缪协兴.煤矿矸石井下处理的研究[J].中国矿业大学学报,2006,35(2):197-200.
    [2]
    Karfakis M G, Bowman C H, Topuz E. Characterization of coal-mine refuse as backfilling material[J]. International Journal of Mining and Geological Engineering,1996,14(2):129-150.
    [3]
    钱鸣高,缪协兴,许家林.资源与环境协调(绿色)开采[J].煤炭学报,2007,32(1):1-7.
    [4]
    缪协兴,钱鸣高.中国煤炭资源绿色开采研究现状与展望[J].采矿与安全工程学报,2009,26(1):1-14.
    [5]
    孙晓光,周华强,王光伟.固体废物膏体充填岩层控制的数值模拟研究[J].采矿与安全工程学报,2007,24(1):117-121,126.
    [6]
    缪协兴.综合机械化固体充填采煤技术研究进展[J].煤炭学报,2012,37(8):1247-1255.
    [7]
    孙春东,张东升,王旭锋,等.超高水材料袋式长壁充填开采覆岩控制技术研究与应用[J].煤炭学报,2015, 40(6):1313-1319.
    [8]
    宁建国,刘学生,史新帅,等.矿井采空区水泥-煤矸石充填体结构模型研究[J].煤炭科学技术,2015,43(12):23-27.
    [9]
    缪协兴,张吉雄.井下煤矸分离与综合机械化固体充填采煤技术[J].煤炭学报,2014,39(8):1424-1433.
    [10]
    Zhang Jixiong, Zhou Nan, Huang Yanli, et al. Impact law of the bulk ratio of backfilling body to overlying strata movement in fully mechanized backfilling mining [J]. Journal of Mining Science,2011,47(1):73-84.
    [11]
    周跃进,陈勇,张吉雄,等.充填开采充实率控制原理及技术研究[J].采矿与安全工程学报,2012,29(3): 351-356.
  • Related Articles

    [1]ZHANG Liang. Design and implementation of an intelligent control platform for Henggu Coal Mine based on multisource configuration technology[J]. Safety in Coal Mines, 2023, 54(9): 227-232. DOI: 10.13347/j.cnki.mkaq.2023.09.031
    [2]YU Zhenjie, LIU Di, ZENG Shangqi, LI Zhe. Design of Belt Conveyor Monitoring System in Hebi No.9 Coal Mine[J]. Safety in Coal Mines, 2019, 50(9): 123-125,129.
    [3]MA Tianbing, ZHANG Shenyu, TAO Xinmin. Centralized Control System for Multiple Belt Conveyors Based on PLC and Configuration Software[J]. Safety in Coal Mines, 2018, 49(11): 99-102.
    [4]ZHU Chenwu. Longmenta Mine Pump House Monitoring System and Its Design of Accessing Digital Mine Platform[J]. Safety in Coal Mines, 2016, 47(7): 140-142.
    [5]LYU Xiang-ting, YU Xue-yong, LIU Meng. Polling Design of High-voltage Comprehensive Protection Device Based on PLC[J]. Safety in Coal Mines, 2013, 44(9): 128-130.
    [6]XU Nai-zhong, TU Min. Program Design and Application of Three-dimensional Gas Extraction Drilling[J]. Safety in Coal Mines, 2013, 44(9): 17-19.
    [7]HUANG He-song, FAN Shi-shuai, WANG Gong-hua, CHEN Dian-xing. System Reconstruction of Main Shaft Loading Equipment in Dongtan Coal Mine Based on PLC and WinCC[J]. Safety in Coal Mines, 2012, 43(10): 119-121,122.
    [8]WAN Zi-yan, HUA Gang, YAN Xin, SONG Xu-juan. On-line Monitoring System of BLA-FJ1 Mine Main Fan Based on MCGS Configuration Software[J]. Safety in Coal Mines, 2012, 43(10): 111-113.
    [9]GUAN Wei-juan, ZHANG Guo-shu, CHEN Qing-hua, DENG Ming. Design and Application of Coal and Gas Outburst Warning System Software[J]. Safety in Coal Mines, 2012, 43(9): 89-91.
    [10]DI Qing-ni, LIU Chun-fu, ZHU Zhao, ZHAO Ke-tao. The Application of PLC Control Technology in Gob Gas Drainage[J]. Safety in Coal Mines, 2012, 43(6): 58-60.

Catalog

    Article views (172) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return