Citation: | WAN Zi-yan, HUA Gang, YAN Xin, SONG Xu-juan. On-line Monitoring System of BLA-FJ1 Mine Main Fan Based on MCGS Configuration Software[J]. Safety in Coal Mines, 2012, 43(10): 111-113. |
[1] |
张巍,胡亚非,王启立,等.基于PLC的煤矿主要通风机在线监控系统[J].煤矿安全,2011(9):72-74.
|
[2] |
李解,胡亚非,徐维维,等.大佛寺矿主要通风机在线监控系统设计[J].煤矿安全,2011(9):91-94.
|
[3] |
徐维维,胡亚非,李解.基于S7-300和Wincc的矿井通风机监测监控系统[J].煤矿安全,2011(7):86-88.
|
[4] |
MCGS用户指南[M].北京:北京昆仑通态自动化软件科技有限公司.
|
[5] |
MCGS参考手册[M].北京:北京昆仑通态自动化软件科技有限公司.
|
[1] | YU Zhenjie, LIU Di, ZENG Shangqi, LI Zhe. Design of Belt Conveyor Monitoring System in Hebi No.9 Coal Mine[J]. Safety in Coal Mines, 2019, 50(9): 123-125,129. |
[2] | CAO Libo. A Mine Monitoring Substation with PLC Function[J]. Safety in Coal Mines, 2019, 50(6): 128-130. |
[3] | MA Tianbing, ZHANG Shenyu, TAO Xinmin. Centralized Control System for Multiple Belt Conveyors Based on PLC and Configuration Software[J]. Safety in Coal Mines, 2018, 49(11): 99-102. |
[4] | ZONG Kezhu, NIU Huaqing, LUAN Hengxuan. Fan Performance Curve Drawing Based on Configuration Software[J]. Safety in Coal Mines, 2016, 47(10): 105-107,111. |
[5] | HUA Gang, ZHENG Qi, YAN Yan. Comprehensive Information Monitoring Platform of Coal Mine Safety Production Based on MCGS[J]. Safety in Coal Mines, 2015, 46(7): 138-141. |
[6] | ZHANG Ping, JIANG Shu-guang, LIU Tao. Application of PLC in Refuge Chamber Monitoring System of Coal Mine[J]. Safety in Coal Mines, 2012, 43(12): 110-112. |
[7] | LI Quan-bao, MA Xiao-ping, JI Mei. Automatic Switchover Without Off-blast Monitoring System of Mine Main Ventilator[J]. Safety in Coal Mines, 2012, 43(11): 95-97. |
[8] | HUANG He-song, FAN Shi-shuai, WANG Gong-hua, CHEN Dian-xing. System Reconstruction of Main Shaft Loading Equipment in Dongtan Coal Mine Based on PLC and WinCC[J]. Safety in Coal Mines, 2012, 43(10): 119-121,122. |
[9] | DI Qing-ni, LIU Chun-fu, ZHU Zhao, ZHAO Ke-tao. The Application of PLC Control Technology in Gob Gas Drainage[J]. Safety in Coal Mines, 2012, 43(6): 58-60. |
[10] | XU Hai, LIU Bo. The Research and Application of Main Drainage Pump Remote Monitoring System Based on PLC[J]. Safety in Coal Mines, 2012, 43(1): 73-76. |