Citation: | KAN Zhitao. Key technology of split-type slitting drill rig with double-arm for mine[J]. Safety in Coal Mines, 2021, 52(7): 129-133. |
[1] |
贾民,徐营,姜希印,等.超前立柱式沿空留巷技术研究[J].采矿与安全工程学报,2017,34(2):228-234.
JIA Min, XU Ying, JIANG Xiyin, et al. Technology of gob-side entry retaining with advance standing props[J]. Journal of Mining & Safety Engineering, 2017, 34(2): 228-234.
|
[2] |
华心祝.我国沿空留巷支护技术发展现状及改进建议[J].煤炭科学技术,2006,34(12):78-81.
HUA Xinzhu. Development status and improved proposals on gob-side entry retaining support technology in China[J]. Coal Science and Technology, 2006, 34(12): 78-81.
|
[3] |
孙守孝.定向预裂爆破在鹿台山矿沿空留巷的应用[J].煤炭技术,2020,39(9):46.
SUN Shouxiao. Research and application of directional presplitting blasting technology in gob side entry in Lutaishan mine[J]. Coal Technology, 2020, 39(9): 46.
|
[4] |
刘衍利,黎卫兵,黄星源.切顶卸压爆破技术在沿空留巷中的应用[J].煤矿安全,2014,45(6):132-135.
LIU Yanli, LI Weibing, HUANG Xingyuan. The application of roof cutting and pressure relief blasting technology in gob-side entry retaining[J]. Safety in Coal Mines, 2014, 45(6): 132-135.
|
[5] |
张占胜.切顶卸压爆破技术在沿空留巷中的应用[J].煤炭技术,2019,38(11):6-8.
ZHANG Zhansheng. Analysis on application of top-loading pressure relief blasting technology in retaining roadway along goaf[J]. Coal Technology, 2019, 38(11): 6-8.
|
[6] |
张盛,王小良,吴自强,等.切顶卸压沿空留巷爆破孔关键参数选择及留巷效果现状分析[J].河南理工大学学报(自然科学版),2019,38(6):1-9.
ZHANG Sheng, WANG Xiaoliang, WU Ziqiang, et al. Status analysis of the key parameters of blasting borehole and the retaining effect for gob-side entry retaining by the way of roof cutting and pressure releasing[J]. Journal of Henan Polytechnic University(Natural Science), 2019, 38(6): 1-9.
|
[7] |
吕保江,赵杨阳.长平煤矿超前预裂爆破切顶卸压技术及成本分析[J].能源与环保,2019,49(9):202.
LYU Baojiang, ZHAO Yangyang. Pressure relief technology of cutting roof by advanced pre-splitting blasting and cost analysis in Changping Coal Mine[J]. China Energy and Environmental Protection, 2019, 41(9): 202.
|
[8] |
高晓旭,门鸿,张志杰.哈拉沟煤矿12201工作面切顶沿空留巷关键技术参数研究[J].煤炭技术,2019,38(9):7-11.
GAO Xiaoxu, MEN Hong, ZHANG Zhijie. Research on key technical parameters of retaining roadway along top of 12201 working face in Halagou Coal Mine[J]. Coal Technology, 2019, 38(9): 7-11.
|
[9] |
陈义东,李学彬,王金国,等.和草沟煤矿50104工作面回风巷预裂切顶卸压技术应用[J].煤炭工程,2017,49(7):72-74.
CHEN Yidong, LI Xuebin, WANG Jinguo, et al. Application of advanced blasting roof cutting and pressure relieving technology in 50104 working face roadway of Hecaogou Coal Mine[J]. Coal Engineering, 2017, 49(7): 72-74.
|
[10] |
高亮,付强,周开放,等.柠条塔煤矿切顶卸压自成巷技术研究及应用[J].中国矿业,2018,27(8):112.
GAO Liang, FU Qiang, ZHOU Kaifang, et al. Research on the technology of gob-side entry retaining automatically formed by roof cutting and pressure release in Ningtiaota coal mine[J]. China Mining Magazine, 2018, 27(8): 112.
|
[11] |
陈盼,阚志涛,张幼振.ZDY750L型钻机在110工法爆破孔施工中的应用[J].煤炭技术,2017,36(12):196-198.
CHEN Pan, KAN Zhitao, ZHANG Youzhen. Application of ZDY750L drilling rig in 110 method blasting hole construction[J]. Coal Technology, 2017, 36(12): 196-198.
|
[12] |
邵俊杰,张宁.ZDY2-300LM 型双工作臂全液压坑道钻机[J].煤矿安全,2020,51(9):126-129.
SHAO Junjie, ZHANG Ning. ZDY2-300LM full hydraulic drilling rig with double working arms[J]. Safety in Coal Mines, 2020, 51(9): 126-129.
|
[13] |
阚志涛,邬迪,张幼振,等.煤矿巷道双臂探放水钻机[J].煤矿安全,2018,49(6):102-104.
KAN Zhitao, WU Di, ZHANG Youzhen, et al. Drilling rig with twin boom for water exploration and drainage in coal mine roadway[J]. Safety in Coal Mines, 2018, 49(6): 102-104.
|
[14] |
白稳乐,宋海涛,姚亚峰,等.ZDY1200T分体式探放水钻机关键技术研究[J].煤矿机械,2014,35(11):96-99.
BAI Wenle, SONG Haitao, YAO Yafeng, et al. Research of key technology of ZDY1200T drainage drilling rig[J]. Coal Mine Machinery, 2014, 35(11): 96-99.
|
[15] |
汪芸.薄煤层全断面履带式钻机关键技术[J].煤矿安全,2020,51(5):146-149.
WANG Yun. Key technology of full section crawler drilling rig in thin coal seam[J]. Safety in Coal Mines, 2020, 51(5): 146-149.
|
[16] |
刘剑杰.液压控制技术在筑路机械中的应用[J].交通运输研究,2011(16) :72-74.
LIU Jianjie. Application of hydraulic pressure control technology in road machinery[J]. TRANSPORT RESEARCH, 2011(16): 72-74.
|
[17] |
阚志涛.煤矿用双臂探放水钻机给进机构的设计[J].煤矿机械,2019,40(5):6-9.
KAN Zhitao. Design of feeding mechanism of drilling rig with twin boom for water exploration and drainage in coal mine[J]. Coal Mine Machinery, 2019, 40(5): 6-9.
|
[18] |
常江华.复合链条张紧装置在煤矿坑道取心钻机的应用[J].煤矿机械,2014,35(5):200-201.
CHANG Jianghua. Application of composite chain tension device in tunnel coring drilling rig[J]. Coal Mine Machinery, 2014, 35(5): 200-201.
|
[19] |
MT/T 790—2006 煤矿坑道勘探用钻机[S].
|
[1] | WANG Lei. Status and Countermeasure of Safety Technology of Inclined-Shaft Man Car of Coal Mine[J]. Safety in Coal Mines, 2020, 51(11): 146-149. |
[2] | SUN Debiao, ZHENG Yi, YANG Ailan, QIU Deyi, CHEN Yong. Design of a New Anti-car-running Barrier in Underground Coal Mine[J]. Safety in Coal Mines, 2020, 51(9): 140-143. |
[3] | ZHANG Su, WANG Ruoxuan, LI Rongrong, GU Haini. Causes of Derailing Accidents of Inclined Shaft Trip Lifting in Coal Mine Based on Behavioral Safety[J]. Safety in Coal Mines, 2018, 49(11): 245-248. |
[4] | LIU Jie. Safety Protection Emphasis and Countermeasures of TBM Method in Inclined Shaft Construction of Coal Mine[J]. Safety in Coal Mines, 2017, 48(s1): 128-132. |
[5] | JIANG Sunlun, YAO Shanhua, REN Mingyuan. Monitoring System for Protective Device of Inclined Shaft Runaway Car in Coal Mine[J]. Safety in Coal Mines, 2016, 47(9): 117-119. |
[6] | ZHOU Meng-ying, LIANG Guo-zhi. Personal Protection Technology in High Temperature Mine[J]. Safety in Coal Mines, 2013, 44(12): 82-84. |
[7] | ZHANG Guo-qing. Test Method for S7-300 PLC Control Protection of Mine Hoist[J]. Safety in Coal Mines, 2013, 44(5): 123-124,125. |
[8] | HUANG He-song, FAN Shi-shuai, WANG Gong-hua, CHEN Dian-xing. System Reconstruction of Main Shaft Loading Equipment in Dongtan Coal Mine Based on PLC and WinCC[J]. Safety in Coal Mines, 2012, 43(10): 119-121,122. |
[9] | ZONG Jian-kang, JIN Guo-rong. A Buried Type Gear Driven Underground Car Column Block and Its Reverse Collision Protection[J]. Safety in Coal Mines, 2012, 43(9): 118-120. |
[10] | REN Nan. Coal Mine Beam Tube Monitoring System Based on S7-200PLC[J]. Safety in Coal Mines, 2012, 43(6): 64-66. |