Citation: | LI Xinchun, HAN Jilei, QIAO Wanguan. Study on Coupling Mechanism of Mine Accident Risk Factors[J]. Safety in Coal Mines, 2015, 46(8): 240-242. |
[1] |
乔万冠,李新春.多因素耦合作用下煤矿企业风险评价[J].煤炭工程,2014,46(4):145-148.
|
[2] |
隋鹏程,陈宝智,隋旭.安全原理[M].北京:化学工业出版社,2005.
|
[3] |
Hudson J. A. Rock Engineering Systems: Theory & Practice [M]. Ellis Horwood , 1992.
|
[4] |
Rob James and Geoff Wells,Safety reviews and their timing[J].J. Loss Press. Process Ind.1994,7(1):11.
|
[5] |
Yosef. S. Shrirf. On risk & risk analysis [J].Reliability Engineering and Safety, 1996,31:155-178.
|
[6] |
冯肇瑞,崔国璋.安全系统工程[M].北京:冶金工业出版社,1987.
|
[7] |
陈昌祺.安全生产与心理学[M].重庆:重庆出版社,1985.
|
[8] |
尹贻勤.煤矿安全问题的心理学分析[M].北京:煤炭工业出版社,1992.
|
[9] |
Anastasia Marina. An Overview of: What are Risks and How does Kamakura Risk Manager Address the Risks [M].Unisys Solutions Services Center, 2002.
|
[10] |
Yates J.F Stone ER. Risk Appraisal[M].New York:John wiley &Sons Ltd,1992:387-408.
|
[11] |
夏喆,邓明然.企业风险传导规律研究[J].财会月刊,2006(10):45-48.
|
[12] |
陈刚.企业生产现场风险预警管理研究[D].武汉:武汉理工大学,2007.
|
[13] |
夏喆,邓明然.基于耦合的企业风险传导模型探讨[J].经济与管理研究,2006(2):36-38.
|