• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LI Chuansen, ZHAO Jianzhong, WANG Lei. Feasibility of Hydraulic Fracturing Method in Roadway Floor Heave Controlling[J]. Safety in Coal Mines, 2014, 45(12): 179-182.
Citation: LI Chuansen, ZHAO Jianzhong, WANG Lei. Feasibility of Hydraulic Fracturing Method in Roadway Floor Heave Controlling[J]. Safety in Coal Mines, 2014, 45(12): 179-182.

Feasibility of Hydraulic Fracturing Method in Roadway Floor Heave Controlling

More Information
  • Published Date: December 19, 2014
  • In order to effectively control and resolve the floor heave problem of 21# material roadway in Lu'an Group Zhangcun Coal Mine, we selected part of the roadway as testing roadway. Through analyzing the failure relation between roof and floor, two sides and coal pillar, we got that the mining influence of 2105 working face is the primary reason; and the squeeze flow is the main floor heave type. According to the actual situation of roadway, we propose the solution that using hydraulic fracturing method to control the floor heave of roadway; FLAC3D numerical simulation results show that the displacement amout of floor heave, roof and two-side is 35 cm, 35 cm and 16 cm, decrease by 68.2%, 50.0% and 64.4% compared to the original supporting respectively, which improves the condition of roadway effectively. Hydraulic fracturing method is an effective way to control the floor heave of roadway.
  • [1]
    陈炎光,陆士良.中国煤矿巷道围岩控制[M].徐州:中国矿业大学出版社,1994:463-473.
    [2]
    柏建彪,李文峰,王襄禹.采动巷道底鼓机理与控制技术[J].采矿与安全工程学报,2011,28(1):1-5.
    [3]
    朱成,白云峰.卸压法在巷道底鼓控制中的应用[J].江西煤炭科技,2012(1):72-73.
    [4]
    黎开勋,党昌志.巷道底鼓分析及控制[J].煤炭工程,2008(9):51 -52.
    [5]
    贾启增.深井动压巷道底鼓治理技术研究与应用[J].煤炭科技,2011(2):15-16.
    [6]
    郭保华.单孔岩样水压致裂的数值分析[J].岩土力学,2010,31(6): 1965-1970.
    [7]
    冯江兵,张科学,路希伟.采动影响下回采巷道底鼓机理及实用性技术研究[J].煤炭技术,2011,30(3):68-70.
    [8]
    邓广哲,王世斌.煤岩水压裂缝扩展行为特性研究[J].岩石力学与工程学报,2004,23(10): 3489-3493.
    [9]
    康红普,冯彦军.定向水力压裂工作面煤体应力监测及其演化规律[J].煤炭学报,2012,37(12):1953-1959.
    [10]
    冯彦军,康红普.定向水力压裂控制煤矿坚硬难垮顶板试验[J].岩石力学与工程学报,2012,31(6):1148-1155.
  • Related Articles

    [1]ZHANG Min. Deformation and failure mechanism and control technology of soft rock roadway in Chengzhuang Mine[J]. Safety in Coal Mines, 2025, 56(2): 166-172. DOI: 10.13347/j.cnki.mkaq.20231177
    [2]SUN Xingping, CHEN Jianben, SUN Tao, HOU Junyou, SUN Yancong. Surrounding rock control technology of overlarge drop fault fracture zone in deep soft rock high stress roadway[J]. Safety in Coal Mines, 2023, 54(1): 117-124.
    [3]GU Shuancheng, ZHOU Pan. Analysis of Bolt Support Characteristics in Soft Rock Roadway[J]. Safety in Coal Mines, 2018, 49(7): 224-228,233.
    [4]ZHU Ying, HAO Zhen, ZHANG Haihong. Controlling Technology of Surrounding Rock in Soft Rock Roadway[J]. Safety in Coal Mines, 2016, 47(7): 76-79.
    [5]XING Luyi, YANG Rui, SONG Zongwu. Mechanism and Control of Deep Roadway Surrounding Rock Deformation and Instability[J]. Safety in Coal Mines, 2016, 47(4): 226-228.
    [6]HUANG Dongmei, TAN Yunliang, CHANG Xikun, FU Yingxia. Grey Relation Analysis of Influenced Factors for Deep Surrounding Rock Stability[J]. Safety in Coal Mines, 2016, 47(3): 202-204.
    [7]WU Lei, ZOU Deyun. Experiment of Yielding Stress Supporting Technology for Kilometer Deep Soft Roadway[J]. Safety in Coal Mines, 2015, 46(7): 63-66.
    [8]JIN Gan, WANG Lianguo, ZHANG Jihua. Failure Characteristics and Support Technology for Deep Half Coal-rock Mining Roadway[J]. Safety in Coal Mines, 2015, 46(1): 126-129.
    [9]ZHANG Shuan-cai. 强矿压小煤柱分层掘进巷道高强联合支护技术[J]. Safety in Coal Mines, 2012, 43(10): 86-88.
    [10]LI Chen, SU Hai-jian, HU Lei. Stability and Support Analysis of the Deep Extremely Soft Roadway[J]. Safety in Coal Mines, 2012, 43(1): 156-159.

Catalog

    Article views (481) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return