• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LIN Dong-cai, WEI Xi-he, LIU Zun-xin, ZHANG Pei-sen. Water Gushing Mechanism and Grouting Sealing Technology of Vertical Shaft lining in Yiqiao Coal Mine[J]. Safety in Coal Mines, 2012, 43(3): 34-37.
Citation: LIN Dong-cai, WEI Xi-he, LIU Zun-xin, ZHANG Pei-sen. Water Gushing Mechanism and Grouting Sealing Technology of Vertical Shaft lining in Yiqiao Coal Mine[J]. Safety in Coal Mines, 2012, 43(3): 34-37.

Water Gushing Mechanism and Grouting Sealing Technology of Vertical Shaft lining in Yiqiao Coal Mine

More Information
  • Published Date: March 09, 2012
  • According to the technical problem of mine shaft lining breaking,water gushing seriously in shaft,many invalid sealing of using single liquid and dual fluid cement and sodium silicate in the deep and thick topsoil under complex hydrogeology conditions of Yiqiao coal mine,combining with the construction quality hypothesis and the vertical additional stress hypothesis of the mine shaft lining breaking theory,the water gushing characteristics and deformation failure mechanism of the main and auxiliary shaft were analyzed.And on this basis,grouting and blocking water gushing and reinforcement of surrounding rock mechanism of the high polymer chemistry material marithan N were studied,and the drill hole layout and the construction technology of grouting between borehole wall of topsoil section,grouting behind the wall of the bedrock section were formulated,and the process monitoring for the grouting quantity and grouting pressure were carried out.Through long-term monitoring of the shaft lining water gushing,the shaft lining water gushing was less than 0.05 m3/h,which realized the purpose of preventing and controlling of shaft lining water gushing,shaft lining breaking,stability of aquifer water pressure,and released and inhibited additional pressure of mine shaft-lining.
  • [1]
    乔卫国,孟庆彬,林登阁,等.唐口煤矿风井井筒锚注法注浆堵水研究[J].矿冶工程,2010,30(6):26-27.
    [2]
    刘希亮.深厚表土不稳定地层中井壁受力研究[M].北京:煤炭工业出版社,2004.
    [3]
    杨维好,崔广心,周国庆,等.特殊地层条件下井壁破裂机理与防治技术的研究(之一)[J].中国矿业大学学报,1996,25(4):1-5.
    [4]
    崔广心,杨维好,吕恒林.深厚表土层中冻结井壁和井壁[M].徐州:中国矿业大学出版社,1998.
    [5]
    夏红春,汤美安.表土层注浆加固法防治井壁破裂的机理及应用[J].采矿与安全工程学报,2009,26(4):408-411.
    [6]
    储飞.新型注浆材料马丽散在刘桥一矿的应用[J].煤炭技术,2007,26(1):99-100.
    [7]
    刘全林,程桦.立井壁后土层注浆加固机理及注浆参数研究[J].煤炭学报,2000,25(5):486-487.
    [8]
    崔广心,杨维好,吕恒林.深厚表土层中的冻结壁和井壁[M].徐州:中国矿业大学出版社,1998.
    [9]
    崔广心.深厚表土中竖井井壁的外载[J].岩土工程学报,2003,25(3):294-298.
    [10]
    刘希亮,罗静,华安增.疏水沉降矿区井壁外侧剪应力分布[J].矿山压力与顶板管理,2000(3):79-83.
  • Related Articles

    [1]ZHANG Jian, CAI Maolin, ZHANG Pengyan, XU Bo, JI Dege. Cold water interception cooling technology for surrounding rock of heat-damaged mine[J]. Safety in Coal Mines, 2023, 54(3): 1-8.
    [2]YANG Zheng, YANG Guangyao, XIE Yongli, WANG Zhongqiang, LI Xiaolong, ZHAO Tingjiang. Application of direct cooling deep enthalpy exhaust heat pump technology in No.2 air shaft of Xiaobaodang Coal Mine[J]. Safety in Coal Mines, 2021, 52(10): 97-100,105.
    [3]JI Changfa, XU Duo, LI Meichen, YANG Chenyu. Influence of Gap of Phase Change Cold Storage Materials on Heat and Moisture Transmission Characteristics of Cooling Suit[J]. Safety in Coal Mines, 2020, 51(8): 239-244.
    [4]ZHANG Jinhao, CHEN Min. A Kind of Regenerable Optical Fiber Cold Connection Device in Coal Mine[J]. Safety in Coal Mines, 2020, 51(8): 147-149.
    [5]BAI Yin, WANG Qi, WANG Changbin. Experimental Study on Flow and Heat Transfer of Ice Slurry in a Horizontal Tube[J]. Safety in Coal Mines, 2018, 49(12): 41-44,49.
    [6]HE Qingsong. Optimal Implementation of Double Hot-standby in Coal Mine Safety Monitoring System[J]. Safety in Coal Mines, 2018, 49(7): 109-111.
    [7]CHEN Liu, YAO Qingli. Thermodynamic Calculation for Mine-used Mixed Type Air Cooler[J]. Safety in Coal Mines, 2017, 48(5): 111-113,116.
    [8]CHENG Zhiyu, FANG Zhao, XIAN Yang, GUO Yanmin, CAI Wentao, JIAO Yanhui. Application of Remote Cold Discharge Device for Backup Power in Changchun Coal Mine[J]. Safety in Coal Mines, 2015, 46(6): 115-117.
    [9]WANG Wen-cai, JIANG Yu-hong, ZHANG Bo, YANG Yu-dong, LIU Wei, HE Long. Study on Heat Release Rate of Coal Combustion in Tunnel[J]. Safety in Coal Mines, 2013, 44(12): 40-42.
    [10]WANG Wei. The Heat Release and Management Research of Mine Hot Water[J]. Safety in Coal Mines, 2012, 43(1): 30-33.

Catalog

    Article views (2192) PDF downloads (2) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return