Citation: | ZHANG Xi-bin. Strong Rock Pressure Appearance Mechanism and Prevention and Control Measures in Large[J]. Safety in Coal Mines, 2013, 44(6): 208-210,213. |
[1] |
钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003.
|
[2] |
华亭煤电股份有限公司华亭煤矿,天地科技股份有限公司开采所.急倾斜特厚煤层深部开采矿压规律研究与应用技术[R].平凉:华亭煤电股份有限公司华亭煤矿,2004.
|
[3] |
龙驭球.弹性地基梁的计算[M].北京:人民教育出版社,1981.
|
[4] |
李前.特厚煤层分层综放开采矿压防治技术研究[C]//2002~2008年度科技与管理论文集,2008:89-102.
|
[5] |
李晖,周澎,薛再君,等.华亭煤矿冲击矿压综合防治技术研究与应用[J].煤矿开采,2009,14(3):90-92.
|
[6] |
聂云枭,李彩芸.华亭煤矿冲击地压综合防治技术[J].煤,2010,19(10):41-43.
|
[7] |
赵景礼.厚煤层全高开采新论[M].北京:煤炭工业出版社,2004.
|
[1] | LI Jianhua, XIE Fuxing, CHEN Kai, JING Guoye, WANG Yongfeng, ZHOU Ming. Research on failure mechanism and control measures of surrounding rock in large section raise shaft construction chamber[J]. Safety in Coal Mines, 2022, 53(11): 212-218. |
[2] | LI Junsheng, XU Xingliang, HU Hongli, ZHAO Yao. A Mixing Temporary Re-equipment Construction Technology for Vertical Shaft in Yuanzigou Coalmine[J]. Safety in Coal Mines, 2017, 48(8): 49-51. |
[3] | YANG Ning, LI Weiteng, XUAN Chao, ZHANG Yuhua. Solid Support System Construction Technology of U-type Concrete Filled Steel Tube Arch of Soft Rock Roadway in Kilometer Deep Mine[J]. Safety in Coal Mines, 2016, 47(12): 82-86. |
[4] | MA Lianghui, ZHANG Jian, WANG Jianjun. Large Inclined Angle Mechanization Retracement Technology at 1201Working Face of Shanzhai Coal Mine[J]. Safety in Coal Mines, 2015, 46(12): 81-83. |
[5] | NIU Jianchun, LU Quanti, GAO Mingshi, ZHAO Yichao, LIU Ang. Rapid Excavation Technology in Large Section Roadway Based on Mechanized Operating Line[J]. Safety in Coal Mines, 2014, 45(11): 125-128. |
[6] | ZHANG Yu-heng. Rapid Construction Technology of Withdrawal Support Channel in Large Mining Height Working Face[J]. Safety in Coal Mines, 2013, 44(7): 129-131. |
[7] | MA Chang-le, YUAN Long-fei, ZHANG Yu, HU Wan-sheng, CAO Chang-jiang, WEI Hong-lei. Rapid Excavation Construction Technology for Large Section Seam Roadway[J]. Safety in Coal Mines, 2013, 44(5): 98-100. |
[8] | LI Zi-quan, XING Chang-yong, YANG Xu, ZHOU Jun. Safety Technology of Integrated Mechanized Tunneling in Single Thick Outburst Coal Seam[J]. Safety in Coal Mines, 2013, 44(3): 96-98. |
[9] | CHEN Xian, WANG Ming-zhi, BAI Feng-zhong, YAO Kai-yuan. Construction Technology of Roadway Pre-grouting Reinforcement in Long-distance Sand Seam[J]. Safety in Coal Mines, 2012, 43(10): 77-79. |
[10] | TIAN Ya-jun. The Research about Rapid and Safety Construction Technology of Shaft in Deep Alluvium and Deep Aquifer[J]. Safety in Coal Mines, 2012, 43(3): 44-47. |