MA Chang-le, YUAN Long-fei, ZHANG Yu, HU Wan-sheng, CAO Chang-jiang, WEI Hong-lei. Rapid Excavation Construction Technology for Large Section Seam Roadway[J]. Safety in Coal Mines, 2013, 44(5): 98-100.
    Citation: MA Chang-le, YUAN Long-fei, ZHANG Yu, HU Wan-sheng, CAO Chang-jiang, WEI Hong-lei. Rapid Excavation Construction Technology for Large Section Seam Roadway[J]. Safety in Coal Mines, 2013, 44(5): 98-100.

    Rapid Excavation Construction Technology for Large Section Seam Roadway

    • In the high gas conditions, the speed of excavation will directly affect the normal replacement of mining working face. Taking excavating working face of Yuwu Coal Company as research objection, affecting factors which directly affect the rapid excavation of large section seam roadway are found through analyzing the excavating working face, and improving methods which include replacing temporary support and optimizing the excavation construction technology and so on are also brought forwards. At same time, each process time is standardized by using theory of industrial engineering management to enhance excavation speed of the seam roadway.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return