Citation: | ZHAO Bin, ZHAO Shankun, LI Lianghui, WANG Yin, ZHAO Yang. Study on failure mode of surrounding rock in longwall face of steep coal seam[J]. Safety in Coal Mines, 2021, 52(4): 60-65. |
[1] |
钱鸣高,许家林,王家臣.再论煤炭的科学开采[J].煤炭学报,2018,43(1):1-13.
QIAN Minggao, XU Jialin, WANG Jiachen. Further on the sustainable mining of coal[J]. Journal of China Coal Society, 2018, 43(1): 1-13.
|
[2] |
王家臣.煤炭科学开采的内涵及技术进展[J].煤炭与化工,2014,37(1):5-9.
WANG Jiachen. The connotation and technical progress of scientific coal mining[J]. Coal and Chemical Industry, 2014, 37(1): 5-9.
|
[3] |
王家臣,刘峰,王蕾.煤炭科学开采与开采科学[J].煤炭学报,2016,41(11):2651-2660.
WANG Jiachen, LIU Feng, WANG Lei. Sustainable coal mining and mining sciences[J]. Journal of China Coal Society, 2016, 41(11): 2651-2660.
|
[4] |
杨胜利,赵斌,杨毅.急倾斜厚煤层水平分段综放覆岩破坏模式实验研究[J].煤炭工程,2017,49 (10):7.
YANG Shengli, ZHAO Bin, YANG Yi. Experimental study on failure mode of horizontal sublevel caving in steeply inclined thick coal seam[J]. Coal Engineering, 2017, 49(10): 7.
|
[5] |
杨胜利,赵斌,李良晖.急倾斜煤层伪俯斜走向长壁工作面煤壁破坏机理[J].煤炭学报,2019,44(2):367.
YANG Shengli, ZHAO Bin, LI Lianghui. Coal wall failure mechanism of longwall working face with false dip in steep coal seam[J]. Journal of China Coal Society, 2019, 44(2): 367-376.
|
[6] |
杨胜利,孔德中.大采高煤壁片帮防治柔性加固机理与应用[J].煤炭学报,2015,40(6):1361-1367.
YANG Shengli, KONG Dezhong. Flexible reinforcement mechanism and its application in the control of spalling at large mining height coal face[J]. Journal of China Coal Society, 2015, 40 (6): 1361-1367.
|
[7] |
孔德中,杨胜利,高林,等.基于煤壁稳定性控制的大采高工作面支架工作阻力确定[J].煤炭学报,2017, 42(3):590-596.
KONG Dezhong, YANG Shengli, GAO Lin, et al. Determin-ation of support capacity based on coal face stability control[J]. Journal of China Coal Society, 2017, 42(3): 590-596.
|
[8] |
伍永平,刘孔智,贠东风,等.大倾角煤层安全高效开采技术研究进展[J].煤炭学报,2014,39(8):1611.
WU Yongping, LIU Kongzhi, YUN Dongfeng,et al. Res-earch progress on the safe and efficient mining technology of steeply dipping seam[J]. Journal of China Coal Society, 2014, 39(8): 1611-1618.
|
[9] |
伍永平,解盘石,任世广.大倾角煤层开采围岩空间非对称结构特征分析[J].煤炭学报,2010,35(2):182.
WU Yongping, XIE Panshi, REN Shiguang. Analysis of asymmetric structure around coal face of steeply dipping seam mining[J]. Journal of China Coal Society, 2010, 35(2): 182-184.
|
[10] |
罗生虎,伍永平,刘孔智,等.大倾角煤层长壁开采空间应力拱壳形态研究[J].煤炭学报,2016,41(12):2993-2998.
LUO Shenghu, WU Yongping, LIU Kongzhi,et al. Study on the shape of the space stress arch shell in steeply dipping coal seam mining[J]. Journal of China Coal Society, 2016, 41(12): 2993-2998.
|
[11] |
伍永平,郎丁,解盘石.大倾角软煤综放工作面煤壁片帮机理及致灾机制[J].煤炭学报,2016,41(8):1878-1884.
WU Yongping, LANG Ding, XIE Panshi. Mechanism of disaster due to rib spalling at fully-mechanized top coal caving face in soft steeply dipping seam[J]. Journal of China Coal Society, 2016, 41(8): 1878-1884.
|
[12] |
高喜才,伍永平,曹沛沛,等.大倾角煤层变角度综放工作面开采覆岩运移规律[J].采矿与安全工程学报,2016,33(3):381-386.
GAO Xicai, WU Yongping, CAO Peipei, et al. Overlying strata movement property of fully mechanized caving angle-varied workface in steep dipping seam[J]. Journal of Mining and Safety Engineering, 2016, 33(3): 381-386.
|
[13] |
张浩,伍永平.大倾角煤层大采高采场基本顶时序性破坏机理[J].煤矿安全,2020,51(3):211-215.
ZHANG Hao, WU Yongping. Timing failure mechanism of basic roof of large mining height stope in steeply dipping coal seam[J]. Safety in Coal Mines, 2020, 51(3): 211-215.
|
[14] |
解盘石,伍永平.大倾角煤层长壁大采高开采煤壁片帮机理及防控技术[J].煤炭工程,2015,47(1):74.
XIE Panshi, WU Yongping. Mechanism and control methods of rib spalling in steeply dipping thick seams in fully mechanized longwall mining with large mining height[J]. Coal Engineering, 2015, 47(1): 74-77.
|
[15] |
黄建功,平寿康.大倾角采面顶板分类研究[J].矿山压力与顶板管理,1999(3):86-90.
|
[16] |
黄建功,平寿康.大倾角煤层采面顶板岩层运动研究[J].矿山压力与顶板管理,2002(2):19-21.
HUANG Jiangong, PING Shoukang. Study of roof strata movement in coal mining face under steep angle[J]. Ground Pressure and Strata Control, 2002(2): 19-21.
|
[17] |
华道友,平寿康.大倾角煤层矿压显现立体相似模拟[J].矿山压力与顶板管理,1999(3):97-100.
|
[18] |
李维光,黄建功,华道友,等.大倾角薄及中厚煤层俯伪斜走向长壁采煤法矿压显现(下)[J].煤矿开采,1999(3):28-31.
|
[19] |
李维光,黄建功,华道友,等.大倾角薄及中厚煤层俯伪斜走向长壁采煤法矿压显现(上)[J].煤矿开采,1999 (2):29-31.
LI Weiguang, HUANG Jiangong, HUA Daoyou, et al. Ground pressure behavior of slanting longwalls in deeply inclined coal seams with thin to medium thickness[J]. Coal Mining, 1999(2): 29-31.
|
[20] |
平寿康,李维光.急倾斜近距离薄煤层联合开采巷道矿压显现[J].煤炭科学技术,1994(10):1-6.
PING Shoukang, LI Weiguang. Strata pressure appearance around roadway during combined coal mining in steep inclined thin seam group with small space between seams[J]. Coal Science and Technology, 1994 (10): 1-6.
|
[21] |
Chowdhury R, Flentje P, Bhattacharya G. Geotechnical Slope Analysis[M]. Taylor & Francis Group, 2010.
|
[22] |
Craig R F. Soil Mechanics[M]. Berkshire:Van Nostrand Reinhold(UK)Co. Ltd, 1983.
|
[1] | SHAO Liangshan, YU Baocai, CHEN Xiaoyong. Key Technology of Mine Intelligent Ventilation[J]. Safety in Coal Mines, 2020, 51(11): 121-124. |
[2] | JIN Yi, SHENG Jiquan, ZHAO Wanxu, ZHU Yunfei. Influence of Atmospheric Pressure Change on Mine Ventilation System[J]. Safety in Coal Mines, 2020, 51(1): 191-195. |
[3] | ZHANG Lihui, ZHANG Yunzeng. Application of Co-rotating Pneumatic Air Door in Pressure Balancing Ventilation System[J]. Safety in Coal Mines, 2018, 49(S1): 45-48. |
[4] | SONG Hongyang. Anti-upwind Device for Scraper Conveyor Passing Air Door in Yungaishan Coal Mine[J]. Safety in Coal Mines, 2018, 49(11): 88-90. |
[5] | YANG Meng, ZHOU Enbo. Design and Key Technologies for Coal Mine Intelligent Emergency Plan Generation System[J]. Safety in Coal Mines, 2018, 49(7): 96-98. |
[6] | WEN Liang, YE Jinjiao, ZHANG Liya. Ultrasonic and Inertial Navigation Technology of Coal Mine Rescue Robot[J]. Safety in Coal Mines, 2017, 48(6): 127-130. |
[7] | WEN Liang. Coal Mine Rescue Communication Technology Based on Mesh Network[J]. Safety in Coal Mines, 2013, 44(4): 135-137. |
[8] | MA Xin-qing, FU Guang-mei, MA Li-Jun, LIU Xue-qing. Ventilation System Reconstruction Program in Xiaochang Coal Mine[J]. Safety in Coal Mines, 2012, 43(9): 65-67,71. |
[9] | ZHANG Bin, SHEN Guang-hui. ZKKG-1型主要通风机不停风倒机系统在矿井通风中的应用[J]. Safety in Coal Mines, 2012, 43(7): 127-129. |
[10] | WANG Wen-cai, QIAO Wang, LI Gang, TIAN Cheng. Application of Mine Intelligent Partial Ventilation System in Huhewusu Coal Mine[J]. Safety in Coal Mines, 2012, 43(6): 114-116. |