• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
GE Liang, JING Tingting. Application of Slow-closing Valves in Emergency Drainage Waterproof Hammer of Inclined Mine[J]. Safety in Coal Mines, 2019, 50(2): 133-136.
Citation: GE Liang, JING Tingting. Application of Slow-closing Valves in Emergency Drainage Waterproof Hammer of Inclined Mine[J]. Safety in Coal Mines, 2019, 50(2): 133-136.

Application of Slow-closing Valves in Emergency Drainage Waterproof Hammer of Inclined Mine

More Information
  • Published Date: February 19, 2019
  • In order to solve the problem that the TPU hose bursts due to the instantaneous high pressure of water hammer caused by the sudden stop of pump in the mine inclined shaft emergency drainage operation, through the comparison of operating mode using different types of pipelines to eliminate residual water of inclined mine, the technical measure of installing a slow-closing valve between the flexible pipeline inlet and the pump outlet is proposed. Based on the research of technical characteristics of multi-functional water pump control valve and slow closing valve of pipe force valve, the differential matching scheme is formed that the drainage pipelines of DN200 and DN150 should be matched with tube force valves of the corresponding specifications preferentially, while the DN100 drainage pipeline and multi-functional water pump control valve with the same diameter should be used in combination, and the test verified that the tube force valve can be applied to the conditions outside of vertical installation. Tests had shown that the flow of horizontally mounted valve was the largest, followed by the tilted state, the smallest was the vertical installation under the same opening degree, and the deviation rate of the flow corresponding to the different opening degree of the DN200 valve in the horizontal installation condition was 2.95% to 4.22%, the type of installation had little effect on the flow performance during the slow-closing process.
  • [1]
    姚源,平立华,宋占松.提高我国煤矿水害事故救援能力对策措施[J].煤矿安全,2015,46(1):224-226.
    [2]
    崔芳鹏,武强,刘德民,等.煤矿突水灾害综合预防与治理技术[J].煤矿安全,2015,46(3):175-177.
    [3]
    孙文洁,韩权,杨恒,等.2000—2015年我国煤矿水害事故特征分析[J].煤炭工程,2017,49(5):95-98.
    [4]
    赵云平,施龙青,高卫富,等.我国煤矿转型发展期内煤矿事故统计分析[J].煤炭技术,2016,35(9):321.
    [5]
    施龙青,刘磊,范伟,等.滕南矿区矿井水灾害链及断链减灾研究[J].煤矿安全,2014,45(2):18-21.
    [6]
    解学才,宫伟东,林辰,等.我国煤矿应急救援现状分析研究[J].煤矿安全,2017,48(11):229-232.
    [7]
    孙保敬.矿山排水抢险应急救援系统的研究[D].北京:中国矿业大学(北京),2011.
    [8]
    寇彦飞.基于水锤防护的矿井水安全排放控制系统研究[D].太原:太原理工大学,2016.
    [9]
    陈太安.大功率潜水电泵在矿山斜井追排水中的应用[J].煤矿机械,2008(2):153-156.
    [10]
    王艳霞,高建朝.多功能水泵控制阀在矿井排水系统中的应用探讨[J].中国煤炭,2007(12):54-55.
    [11]
    王贤辉.矿用液压缓阻多功能水泵联动阀的研究[D].太原:太原理工大学,2012.
    [12]
    朱铁强.管力阀的分析与应用[J].阀门,2017(1):39.
  • Cited by

    Periodical cited type(13)

    1. 李志华,耿倩,杨科,邹恩隆,何祥. 综采工作面垮落带注浆充填开采覆岩采动裂隙定量表征试验研究. 中国矿业. 2024(02): 159-167 .
    2. 亢军. 厚冲击层薄基岩下工作面支架额定工作阻力研究. 煤矿机电. 2023(01): 56-59 .
    3. 解建,许大强,胡伟,张培森. 工作面上覆松散含水层注浆改造及其效果检验. 煤矿安全. 2023(10): 168-175 . 本站查看
    4. 程桦,张亮亮,姚直书,彭世龙,郭龙辉. 厚松散层薄基岩非对称开采井筒偏斜机理. 煤炭学报. 2022(01): 102-114 .
    5. 高永格,张强,牛矗,张开. 沿空留巷顶板覆岩二次采动裂隙实测分析. 煤炭科学技术. 2022(03): 78-84 .
    6. 石磊. 辛置矿顶板离层水突涌机理及防治技术研究. 山东煤炭科技. 2022(08): 167-170 .
    7. 赵光荣,郝燕奎,申文彪,郑帅. 实施安全离层注浆的覆岩离层位置初探. 内蒙古煤炭经济. 2022(15): 41-43 .
    8. 彭世龙,程桦,姚直书,荣传新,蔡海兵,张亮亮. 厚松散层底含直覆薄基岩开采地表沉陷预计及特征研究. 煤炭学报. 2022(12): 4417-4430 .
    9. 吴建兰. 煤矿断层采动作用模拟分析. 山西冶金. 2021(02): 72-73+86 .
    10. 武俊州. 3116工作面覆岩运动规律及离层充填注浆技术研究. 山东煤炭科技. 2021(05): 63-65+69+72 .
    11. 姜文浩. 薄基岩工作面顶板精细化探查技术研究. 煤炭科技. 2021(03): 110-113 .
    12. 陈正华,徐洪,曾亮,杨富军. 倾斜煤层采动条件下覆岩移动规律研究. 地下水. 2021(06): 197-199+272 .
    13. 刘剑,屈井丰. 神东矿区厚松散层下采煤沉陷相似材料实验研究. 煤炭工程. 2021(S1): 76-80 .

    Other cited types(9)

Catalog

    Article views (118) PDF downloads (0) Cited by(22)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return