• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LIU Han-Wen. The Application of Mining Terminal Line Fire Prevention Technology of Fully Mechanized Caving Face in Jining No.3 Coal Mine[J]. Safety in Coal Mines, 2012, 43(8): 142-144.
Citation: LIU Han-Wen. The Application of Mining Terminal Line Fire Prevention Technology of Fully Mechanized Caving Face in Jining No.3 Coal Mine[J]. Safety in Coal Mines, 2012, 43(8): 142-144.

The Application of Mining Terminal Line Fire Prevention Technology of Fully Mechanized Caving Face in Jining No.3 Coal Mine

More Information
  • Published Date: August 09, 2012
  • Before fully mechanized caving face of spontaneous combustion coal seam stop mining,the top-coal is not be recycled,and after the retracement of working face support,the top-coal will fall.When the working face is not tightly closed or coal pillar along the gob fractured and coal crushed,the air leakage channel is formed,which provides the conditions for spontaneous combustion of the lost coal in gob.These can easily result in spontaneous combustion in closed gob coal mining terminal line.How to quickly determine the firing position and to rapid eradicate fire by using effective means,to reduce the hazards of spontaneous combustion on mine and to decrease material waste on the prevention process are the main problems in mine.This article summarizes a set of effective prevention fire technology about fully mechanized caving face mining terminal line by the research of spontaneous combustion on 163low04 working face mining terminal line.
  • [1]
    张国枢,谭允祯,陈开岩,等.通风安全学[M].徐州:中国矿业大学出版社,2004:251-251.
    [2]
    曲荣飞,李大鹏,肖森,等.综放工作面终采线自燃隐患治理技术分析[J].矿业安全与环保,2007,34(4):60-61.
    [3]
    刘含文,朱敏,肖森.综放工作面采空区自燃隐患治理分析[J].中国煤炭,2008,34(8):103-105.
    [4]
    王旭,郝迎格,宋先明,等.南屯煤矿大面积采空区漏风控制技术与实践[J].煤矿安全,2011,42(7):110-113.
  • Related Articles

    [1]ZHANG Yunfeng. Grouting and plugging technology of in-seam borehole methane drainage[J]. Safety in Coal Mines, 2021, 52(10): 87-91.
    [2]ZHAO Feng. Application of Grouting Water Plugging Technology in Railway Tunnel of Coal Mine[J]. Safety in Coal Mines, 2015, 46(12): 147-150.
    [3]TU Xingzi, GUO Chunsheng, LI Haiyang. Uniform Grouting Technology of Crushed Surrounding Rock of Deep Roadway[J]. Safety in Coal Mines, 2015, 46(11): 81-84.
    [4]TIAN Duo, SHI Haoyu. Development and Application of High Pressure Sealing Grouting Experimental System[J]. Safety in Coal Mines, 2015, 46(10): 111-113,116.
    [5]YANG Renshu, XUE Huajun, HE Tianyu, GUO Dongming, LI Taotao, ZHAO Pengfei. Grouting Support Technology of Fractured Surrounding Rock in Deep Roadway[J]. Safety in Coal Mines, 2015, 46(7): 105-108.
    [6]XIONG Zuqiang, GONG Yanhua, LIU Chengwei. Grouting Reinforcement Technology for Crushed Surrounding Rock Roadway[J]. Safety in Coal Mines, 2014, 45(10): 68-70.
    [7]LI Xue-liang, WU Jian, TIAN Ying-bin. The Application of FLAC3D in Goaf Grouting Reinforcement[J]. Safety in Coal Mines, 2013, 44(12): 201-203.
    [8]WANG Peng, YE Shu-fa, WANG Hui, WU Song. Omni-directional Comprehensive Grouting Reinforcement Technology for Underground Tunnel[J]. Safety in Coal Mines, 2013, 44(4): 103-105.
    [9]ZHANG Jin-shan, MA Meng, FAN Zhong-ming, KOU Fei-fei, ZHENG Yan-tao. Advance Roof Grouting Technology in Pinggou Coal Mine[J]. Safety in Coal Mines, 2012, 43(11): 143-145.
    [10]PAN Jun-zhu. Fire Prevention and Extinguishing Practice on Fully Mechanized Working Face Based on Pressure Ventilation and Grouting Coupling Technique[J]. Safety in Coal Mines, 2012, 43(3): 96-99.

Catalog

    Article views (891) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return