Citation: | LI Chao, KANG Tianhe, ZHANG Bin. Experimental Study on Weakening Hard Roof by Pre-splitting Blasting During Initial Mining at Fully-mechanized Caving Face[J]. Safety in Coal Mines, 2015, 46(10): 28-31. |
[1] |
史元伟. 采煤工作面围岩控制原理和技术[M].徐州:中国矿业大学出版社,2005:46-50.
|
[2] |
宋永津. 注水、压裂、弱化-控制煤层坚硬难冒顶板技术[M].北京:煤炭工业出版社,2002:6-9.
|
[3] |
陈炎光,钱鸣高. 中国煤矿采场围岩控制[M].徐州:中国矿业大学出版社,1994:18-21.
|
[4] |
崔永杰,孙琪,郑跃兵,等. 坚硬顶板弱化处理防止瓦斯骤然涌出[J].煤炭技术,2011,30(12):80-82.
|
[5] |
沈玉旭,康天合,杨永康,等. 综放初采顶板深孔预裂爆破的研究与实践[J].矿业研究与开发,2013,33(4):122-125.
|
[6] |
王岩,梁冰,袁欣鹏. 易自然煤层综放工作面安全开采方法研究[J].采矿与安全工程学报,2012,29(5):730-734.
|
[7] |
郭卫彬,刘长友,吴锋锋,等. 坚硬顶板大采高工作面压架事故及支架阻力分析[J].煤炭学报,2014,39(7):1212-1219.
|
[8] |
康天合,柴肇云,李义宝,等.底层大采高综放全厚开采20 m特厚中硬煤层的物理模拟研究[J].岩石力学与工程学报,2007,26(5):1065-1072.
|
[9] |
贾喜荣. 岩石力学与岩层控制[M].徐州:中国矿业大学出版社,2010:67-70.
|
[10] |
钱鸣高,刘听成. 矿山压力及其控制[M].北京:煤炭工业出版社,1991:45-46.
|
[11] |
郭德勇,商登莹,吕鹏飞,等. 深孔聚能爆破坚硬顶板弱化试验研究[J].煤炭学报,2013,38(7):1149.
|
[1] | CHENG Lixing. Parameter optimization analysis and mechanical property test research based on reaming anchorage[J]. Safety in Coal Mines, 2023, 54(7): 196-204. |
[2] | LIU Yaxin, XING Minglu, LIU Pengcheng, FU Yankun. Study on fine numerical simulation of pull-out test process of anchor rock with rebar anchor[J]. Safety in Coal Mines, 2022, 53(3): 66-74. |
[3] | LIU Hongwang. Failure Analysis of Anchor Cable Tray of Mining Roadway in Island Working Face[J]. Safety in Coal Mines, 2016, 47(11): 204-207. |
[4] | SUN Haiyang, WANG Lianguo, LU Yinlong, HUANG Yaoguang. Numerical Simulation and Parameter Optimization of Advance Anchor Bolt Support in Fault[J]. Safety in Coal Mines, 2015, 46(8): 205-208. |
[5] | WANG Lin, WANG Guanghong. Numerical Simulation on Failure Characteristics of Mining Coal Seam Floor[J]. Safety in Coal Mines, 2015, 46(7): 211-214. |
[6] | JIA Xige, LI Yingming, MENG Xiangrui, WANG Yuliang. Failure Mechanism Analysis and Structural Optimization of Glass Fiber Reinforced Plastics Bolting Tray Based on ANSYS[J]. Safety in Coal Mines, 2015, 46(5): 212-215. |
[7] | ZHAO Yajun, YANG Yong, HE Long, WANG Wei, LEI Ming, YAN Xiaonan. Numerical Simulation of Reinforcement Arch Theory of High Pre-stress Anchor Bolt[J]. Safety in Coal Mines, 2014, 45(9): 47-50. |
[8] | LIU Yi-xin. Numerical Simulation of Mining Overburden Failure Law[J]. Safety in Coal Mines, 2013, 44(12): 198-200. |
[9] | ZHANG Lian-ying, MA Chao, LI Yan. Numerical Simulation of Bolting Support Mechanism[J]. Safety in Coal Mines, 2013, 44(9): 71-73. |
[10] | MA Shao-jie. Numerical Simulation Study on Overlying Strata Failure of Coal Mining[J]. Safety in Coal Mines, 2012, 43(12): 54-56. |
1. |
张周爱,李新鹏,缪卫峰,周志伟,史广诚. 雨水作用下缓倾角岩层露天煤矿凸边坡变形机理研究. 中国矿业. 2024(S1): 128-136+142 .
![]() | |
2. |
陈德付. 基于流固耦合的露天矿易滑区边坡稳定性分析. 露天采矿技术. 2024(04): 74-78 .
![]() | |
3. |
吴奇靖,赵永茂. 降雨作用下含软弱带斜坡稳定性研究. 福建建材. 2024(08): 74-77 .
![]() | |
4. |
朱振. 基于FLAC某边坡失稳数值模拟分析. 陕西水利. 2023(02): 21-22+27 .
![]() | |
5. |
罗科,高瑜,张斌. 煤层自燃对高陡露天矿边坡稳定性的影响与防治对策. 煤矿安全. 2022(01): 191-197 .
![]() | |
6. |
朱涛,尹翔,王成汤,闵弘,王浩,陈娱,何俊霖. 西昌太和矿北采场滑坡变形演化规律及成因机制研究. 岩土力学. 2022(S2): 392-400+413 .
![]() | |
7. |
孙世国,高晨,冯少杰,邓王倩. 水厂铁矿河西渣土场雨季滑移变形规律研究. 矿业研究与开发. 2022(12): 50-55 .
![]() | |
8. |
吴榕真,舒应秋,李志强,关云泽. 基于水影响作用下的露天煤矿边坡稳定性研究. 露天采矿技术. 2021(03): 26-29 .
![]() | |
9. |
田光,韩流,舒继森,杨日. 孔隙水压力重分布对排土场边坡稳定性影响规律研究. 煤矿安全. 2021(08): 239-242+247 .
![]() |