WANG Li, JIA Mingqun, SUN Xinsheng, ZHANG Jinbao. Mechanical Analysis and Optimal Design of Fixture for Screen Pipe Gas Drainage Borehole Completion in Underground Coal Mine[J]. Safety in Coal Mines, 2015, 46(7): 109-112.
    Citation: WANG Li, JIA Mingqun, SUN Xinsheng, ZHANG Jinbao. Mechanical Analysis and Optimal Design of Fixture for Screen Pipe Gas Drainage Borehole Completion in Underground Coal Mine[J]. Safety in Coal Mines, 2015, 46(7): 109-112.

    Mechanical Analysis and Optimal Design of Fixture for Screen Pipe Gas Drainage Borehole Completion in Underground Coal Mine

    • According to the poor reliability of fixture used in large inclined angle borehole and low strength of locking coupling in underground coal mine. By means of mechanical model, optimization calculation and finite element method, the relationship between the length of claw, opening angle and borehole diameter, component force of wedging in borehole wall is studied. The stress distribution of locking coupling, pin hole of claw is analyzed when screen pipe is cased. The results showed that the hang performance is better when the length of claw is 97 mm. The groove tip and pin hole of claw is the area of stress concentration, they will reach the yield limit consecutively.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return