ZHOU Jun, DING San-hong, PENG Long-chao, SHAN Jing-xin, HU Rong-jie. Underground Control Techniques and Practice of High-water Poor Sealing Hydrology Long-term Observation Hole[J]. Safety in Coal Mines, 2013, 44(2): 80-82.
    Citation: ZHOU Jun, DING San-hong, PENG Long-chao, SHAN Jing-xin, HU Rong-jie. Underground Control Techniques and Practice of High-water Poor Sealing Hydrology Long-term Observation Hole[J]. Safety in Coal Mines, 2013, 44(2): 80-82.

    Underground Control Techniques and Practice of High-water Poor Sealing Hydrology Long-term Observation Hole

    • The high-water poor sealing hydrology long-term observation hole which is hard to seal on the ground uses underground sealing scheme. Through the methods of geophysical prospecting combined with drilling, hole-sealing combined with plugging, ground combined with underground grouting, the aquifers up and down the hydrological holes are carried out sealing grouting to cut down the hydraulic connection of aquifers around the hydrological holes, and then effect analysis, verification and evaluation are carried out to get the goal of controlling drilling water diaster.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return