JIA Wen-an. Vertical Shaft Freezing and Outside Wall Fast Construction Technology in South Airshaft Well of Yuwu Coal Industry[J]. Safety in Coal Mines, 2012, 43(2): 50-52.
    Citation: JIA Wen-an. Vertical Shaft Freezing and Outside Wall Fast Construction Technology in South Airshaft Well of Yuwu Coal Industry[J]. Safety in Coal Mines, 2012, 43(2): 50-52.

    Vertical Shaft Freezing and Outside Wall Fast Construction Technology in South Airshaft Well of Yuwu Coal Industry

    • Fast construction for digging shaft and freezing wall was implemented by using advanced equipment which contained skiphoist,center rotary grasp rock machine,automatic batching system,single-slotted hydraulic stripping overall metal template and forced concrete mixer.Advanced blasting technologies with hole,smooth,weak shock,weak rushed,anti-noise nonel were adopted.Rapid construction with high-quality organization achieved good results.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return