• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
HAO Zhe, WANG Zhen-wei, CHEN Dian-qiang, LIU Hai-yang. Combined Prediction Model of Deep Open Pit High Slope Deformation[J]. Safety in Coal Mines, 2012, 43(11): 74-76,77.
Citation: HAO Zhe, WANG Zhen-wei, CHEN Dian-qiang, LIU Hai-yang. Combined Prediction Model of Deep Open Pit High Slope Deformation[J]. Safety in Coal Mines, 2012, 43(11): 74-76,77.

Combined Prediction Model of Deep Open Pit High Slope Deformation

More Information
  • Published Date: November 09, 2012
  • The paper establishes neural network-time series combined model;the trend term is extracted by the neural network,and random items are fitted by time series.Various factors leading to slope deformation are taken into more comprehensive consideration;it overcomes the defects of single models Combined with tracking algorithm,the southern slope and western slope of Dongming coal mine were analyzed through the combined model.Then,the result was compared with fitting results of single time series model and neural network model.The result shows that combined model has better fitting and forecasting ability in slope system analysis.
  • [1]
    刘晓,曾祥虎,刘春宇.边坡非线性位移的神经网络-时间序列分析[J].岩石力学与工程学报,2005,24(19):3499-3504.
    [2]
    秦胜伍,陈剑平.隧道围岩压力的神经网络时间序列分析[J].吉林大学学报:地球科学版,2008,38(6):1005-1009.
    [3]
    谈小龙,徐卫亚,刘大文,等.高边坡变形的组合预测模型及其应用[J].水利学报,2010,41(3):294-298.
    [4]
    张奇华,徐松林,刘祖德.边坡系统的变形行为特征及模型化研究[J].岩土工程学报,2001,23(5):632-633.
    [5]
    Zhang G P.Time Series Forecasting Using a Hybrid ARI-MA and Neural Network Model[J].Neurocomputing,2003,50(5):159-175.
    [6]
    Contreras J,Rosario E,Nogales F J,et al.ARIMA Mod-els to Predict Next-Day Electricity Prices[J].IEEETransactions on Power Systems,2003,18(3):179-192.
    [7]
    赵洪波,冯夏庭.非线性位移时间序列预测的进化.支持向量机方法及应用[J].岩土工程学报,2003,25(4):468-471.

Catalog

    Article views (744) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return