LI Liang, JIANG Yanjun, YU Tao, HAN Bing, PENG Bo. Surrounding Rock Stability and Control Technology of Expanded Roadway in “Three-soft” Thick Top Coal Mining Roadway[J]. Safety in Coal Mines, 2019, 50(10): 107-111.
    Citation: LI Liang, JIANG Yanjun, YU Tao, HAN Bing, PENG Bo. Surrounding Rock Stability and Control Technology of Expanded Roadway in “Three-soft” Thick Top Coal Mining Roadway[J]. Safety in Coal Mines, 2019, 50(10): 107-111.

    Surrounding Rock Stability and Control Technology of Expanded Roadway in “Three-soft” Thick Top Coal Mining Roadway

    • The construction process of gob-side entry retaining in 12209 Zhaojiazhai Mine includes “expanding lane and filling”. Calculated by theoretical analysis, the size of the filling wall is determined as 2.2 m, and FLAC3D software is used to simulate the displacement of roadway and the distribution of surrounding plastic zone of 2.5 m, 3.0 m, 3.5 m and 4 m. It is determined that the size of 12209 lower lane is 3.5 m. Four kinds of support schemes after road expansion are proposed, and the “anchor + anchor cable + hydraulic lifting shed” is determined as the best solution, and successfully applied on site.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return