Citation: | LI Hao. Straight-line Positioning and Pushing Technology of Scraper Conveyor in Intelligent Workface[J]. Safety in Coal Mines, 2019, 50(3): 103-106. |
[1] |
孟国营,程晓涵.我国矿用刮板输送机技术现状及发展分析[J].煤炭工程,2014,46(10):58-60.
|
[2] |
白晓辉,任中全,刘海燕.刮扳输送机中部槽弯曲角度设计计算[J].煤矿机械,2011(6):21-22.
|
[3] |
姜举臣.综采工作面重型刮板输送机的现状与发展趋势[J].中国新技术新产品,2014(9):144-146.
|
[4] |
李国平,穆润青,王俊涛,等.刮板输送设备发展历程及技术发展方向探讨[J].煤矿机械, 2018,39(5):1.
|
[5] |
于聚旺.综采工作面刮板输送机优化设计关键技术研究[J].中国煤炭,2017,43(9):73-78.
|
[6] |
王金华,黄乐亭,李首滨,等.综采工作面智能化技术与装备的发展[J].煤炭学报,2014,39(8):1418.
|
[7] |
张智喆,王世博,张博渊,等.基于采煤机运动轨迹的刮板输送机布置形态检测研究[J].煤炭学报,2015, 40(11):2514-2521.
|
[8] |
陈令国,赵江华,梅雪峰.综采工作面刮板输送机的自动化[J].工矿自动化,2011(12):24-26.
|
[9] |
徐刚.综采工作面配套技术研究[J].煤炭学报,2010, 35(11):1921-1924.
|
[10] |
李俊士.一种基于多种传感器的工作面找直方法[J].煤矿机电,2014(6):11-12.
|
[11] |
杨曌.基于视觉测量的综采工作面直线度测量技术研究[J].煤炭工程,2016,48(9):134-136.
|
[12] |
牛剑峰.综采工作面直线度控制系统研究[J].工矿自动化,2015,41(5):5-8.
|
[1] | JIANG Lijuan, ZHANG Junhu, DENG Cunbao, NIAN Jun, CAI Meng, LYU Xiaobo, LEI Changkui. Research on distribution characteristic of “three zones” of coal spontaneous combustion in goaf with double cut roof retaining roadway[J]. Safety in Coal Mines, 2023, 54(12): 56-63. DOI: 10.13347/j.cnki.mkaq.2023.12.009 |
[2] | XUAN Zhongtang, ZHAO Shankun, YANG Xiaocheng, YANG Yong, LYU Kun. Deformation Characteristics and Reinforcement Support Technology of Surrounding Rock in Multi-Lane Filling and Retaining Roadway[J]. Safety in Coal Mines, 2019, 50(10): 93-97. |
[3] | ZHOU Rui. Numerical Simulation on Creep Properties of Filling Body of Gob-side Entry Retaining[J]. Safety in Coal Mines, 2018, 49(3): 218-221. |
[4] | ZHU Huaizhi, WANG Miao, XU Pengwei, HUANG Chengjun. Application of Pier Column Gob-side Entry Retaining Roadway in Weak Roof Coal Seam[J]. Safety in Coal Mines, 2017, 48(11): 159-162. |
[5] | CHI Xiuwen, ZHANG Wenju, ZHANG Jiuyu. Roadway Side Support of “Finite Deformation” in Gob-side Entry Retaining Under Hard Roof[J]. Safety in Coal Mines, 2017, 48(10): 191-194. |
[6] | ZHANG Zhaoyi, ZHANG Kaizhi, YIN Dawei, SUN Zhishuai, LIU Baocheng. Pre-cutting Roof Gob Side Entry Retaining Supporting Technology for Roadway[J]. Safety in Coal Mines, 2016, 47(11): 222-225. |
[7] | ZHAO Yuxiang, LEI Yanzhi, YANG Xiaolong, YANG Fang. Gob-side Entry Retaining Technology Under Coal Pillar of Goaf in "Two Hard" and Thin Coal Seam[J]. Safety in Coal Mines, 2015, 46(12): 88-91. |
[8] | SHI Jianjun, ZHANG Jun, YAN Dezhong. Numerical Simulation on Roadway-side Support Resistance for Gob-side Entry Retaining[J]. Safety in Coal Mines, 2015, 46(9): 57-60. |
[9] | SHI Jian-jun, SHI Hao-yu. Numerical Simulation Analysis of Roof Fracture Laws for Gob-side Entry Retaining[J]. Safety in Coal Mines, 2013, 44(9): 191-193,194. |
[10] | LI Yan-jun, ZHANG Bao, LI Li, LI Jun-feng, LI Zong-chao, LI Wei-bin. Anclysis of Roadway Supporting Scheme for Gob-side Entry Retaining in 18205 Face of Tunlan Mine[J]. Safety in Coal Mines, 2013, 44(6): 79-81. |