• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LI Ji-xing, XU Lei, JIANG Hong-jun. Laneway's Side Stability Mechanism and Support Technology in Super-high Roadway[J]. Safety in Coal Mines, 2012, 43(10): 60-63.
Citation: LI Ji-xing, XU Lei, JIANG Hong-jun. Laneway's Side Stability Mechanism and Support Technology in Super-high Roadway[J]. Safety in Coal Mines, 2012, 43(10): 60-63.

Laneway's Side Stability Mechanism and Support Technology in Super-high Roadway

More Information
  • Published Date: October 09, 2012
  • Taking super-high roadway appeared in 5203 track roadway in a mine of Shanxi as research object.The horizontal displacement,subsidence features and plastic zone distribution characteristics of laneway’s side in super-high roadway are described with comparison analysis method in this paper.Through analyzing mechanical model of rib spalling,constraint theory of anchor wall of laneway’s side on deep surrounding rock and pressure bar destabilization of metallic support generated in steel timber leg of super-high roadway,finally,the support form of using high strength bolts,steel strip,anchor net and anchor cable to reinforce laneway’s side is adopted,and the reasonable supporting parameters are determined.The result of engineering practice proves that the laneway’s side stabilization theory of super-high roadway is suitable to the laneway’s side support of super-high roadside.
  • [1]
    柏建彪.动压巷道围岩稳定理论与控制技术研究[R].徐州:中国矿业大学,2006.
    [2]
    勾攀峰,侯朝炯.回采巷道锚杆支护顶板稳定性分析[J].煤炭学报,1999(5):466-470.
    [3]
    王卫军,侯朝炯.回采巷道煤柱与底板稳定性分析[J].岩土力学,2003(1):75-78.
    [4]
    侯朝炯,马念杰.煤层巷道两帮煤体应力和极限平衡区的探讨[J].煤炭学报,1989(4):21-29.
    [5]
    贾俊峰.煤巷片帮类型及锚固机理研究[J].太原理工大学学报,2005(1):93-95.
    [6]
    陈荣德,宫世文,刘天习.深井软岩巷道掘进迎头片帮防治技术[J].辽宁工程技术大学学报,2007(S2):19-21.
    [7]
    侯朝炯,马念杰.工字钢梯形可缩性支架[J].煤炭科学技术,1992(1):24-26.
    [8]
    张益东,侯朝炯.U型钢可缩性巷道支架实际承载能力的计算[J].矿山压力与顶板管理,1992(3):16-22.
    [9]
    侯朝炯,张树东,邹喜正.巷道可缩性金属支架主要架型的研究[J].中国矿业学院学报,1987(2):11-18.
    [10]
    康红普.高强度锚杆支护技术的发展与应用[J].煤炭科学技术,2000(2):1-4.
    [11]
    勾攀峰,侯朝炯.锚固岩体强度强化的实验研究[J].重庆大学学报:自然科学版,2000(3):35-39.
    [12]
    王卫军,侯朝炯.回采巷道煤帮锚杆支护可靠性分析[J].岩石力学与工程学报,2001(6):813-816.
  • Related Articles

    [1]HAN Jialiang, LIU Jianlin, TANG Shengli. Research on double-stage double-speed reaming drill bit for high-position and large-diameter drilling in coal mine roof[J]. Safety in Coal Mines, 2023, 54(9): 194-201. DOI: 10.13347/j.cnki.mkaq.2023.09.026
    [2]SHI Wenbao, ZHOU Wei, LI Zhenfu, PENG Xingqiu. Study on response characteristics of bolt bit drilling into sandstone[J]. Safety in Coal Mines, 2021, 52(4): 85-88.
    [3]LI Peng, MO Haitao, ZHANG Qiang, LI Zijian. Application of Reaming Drill Bit in Horizontal Directional Well[J]. Safety in Coal Mines, 2020, 51(1): 107-110.
    [4]LI Yanming, XIAO Lihui, XU Shubin, GUO Zhijun. Design of Special Drill Bit for Casing Drilling in Mining Stability Zone[J]. Safety in Coal Mines, 2019, 50(3): 89-91,95.
    [5]ZHANG Peng, WANG Chuanliu, FAN Yunlin, MA Yu. Development and Application of PDC Bit for Auger Drilling and Rapid Casing Running Technology[J]. Safety in Coal Mines, 2018, 49(8): 92-94,98.
    [6]GUO Hui. Type Selection of Drilling Bit for Large Diameter Drilling in Hanglaiwan Coal Mine[J]. Safety in Coal Mines, 2018, 49(3): 112-114.
    [7]ZHANG Rui. Parameters Optimization for External Nozzle of Reverse Circulation Sampling Drill Bit in Underground Coal Mine[J]. Safety in Coal Mines, 2017, 48(2): 101-104.
    [8]ZHAO Zhiqiang. Bottom Structural Parameters Optimization of Reverse Circulation Drill Bit[J]. Safety in Coal Mines, 2016, 47(3): 94-97.
    [9]ZHANG Tao, GUO Baoduo. Application of Drag PDC Bit in Gas Extraction Drilling of Coal Mine[J]. Safety in Coal Mines, 2015, 46(12): 96-97,100.
    [10]SUN Sheng, TANG Dayong, SUN Dai, ZHANG Ning. Design of Large Diameter Combined Drill Bit[J]. Safety in Coal Mines, 2014, 45(11): 95-97.

Catalog

    Article views (911) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return