• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
YU Enxiao, MA Litao, YAN Junting, ZHOU Fushuang. Study and Application of Water Production Characteristics and Drainage and Mining Control Methods in Different Drainage and Mining Stages of CBM Wells[J]. Safety in Coal Mines, 2019, 50(2): 179-182.
Citation: YU Enxiao, MA Litao, YAN Junting, ZHOU Fushuang. Study and Application of Water Production Characteristics and Drainage and Mining Control Methods in Different Drainage and Mining Stages of CBM Wells[J]. Safety in Coal Mines, 2019, 50(2): 179-182.

Study and Application of Water Production Characteristics and Drainage and Mining Control Methods in Different Drainage and Mining Stages of CBM Wells

More Information
  • Published Date: February 19, 2019
  • This paper, through the mechanism analysis and data analysis, studies the different characteristics of water supply in the one-phase water flow stage, critical desorption stage, and water-gas two-phase flow stage, during the overall CBM development procedure and proposes a whole set of elaborate control methods for bottom flow pressure. The results show that the water supply from coal seams to the bottom of wells in single-phase flow stage increases continuously with the increase of time, so that the increase of the pumping units with the drainage time can maintain the constant pressure drop rate. Due to the frequent change of phase state, the water supply of coal seam fluctuates greatly, so it is necessary to pay close attention to the changes of water volume and bottom hole pressure in order to prevent the flow pressure dropping sharply. In two-phase stage, slow down the pumping units in advance for the first time of gas releasing and start from the tiny amount gradually. In steady output stage, the principle of slight and frequent gas release should be followed to guarantee the stability of bottom hole pressure and water production with the steady rising of gas production.
  • [1]
    刘新福,綦耀光,刘春花,等.气水两相煤层气井井底流压预测方法[J].石油学报,2010,31(6):998-103.
    [2]
    贾慧敏.高煤阶煤岩孔隙结构分形特征研究[J].石油化工高等学校学报,2016,29(1):53-56.
    [3]
    孟猛,邱正松,刘均一,等.注超临界CO2开发煤层气技术研究进展[J].煤炭科学技术,2016,44(1):187.
    [4]
    贾慧敏,胡秋嘉,刘忠,等.缝应力敏感性对煤层气井单相流段产水影响及排采对策[J].中国煤层气,2017,14(5):31-34.
    [5]
    王军鹏.沁水盆地南部煤层气储层敏感性评价与保护技术研究[J].中国煤层气,2014,11(1):25-29.
    [6]
    贾慧敏,孙世轩,毛崇昊,等.基于煤岩应力敏感性的煤层气井单相流产水规律研究[J].煤炭科学技术,2017,45(12):189-193.
    [7]
    张贺,王少雷,刘康康.柳林区块煤层气直井排采技术分析[J].中国煤层气,2015,12(2):27-30.
    [8]
    袁浩文.煤层气井排采制度优化[D].成都:西南石油大学,2015.
    [9]
    毛慧,韩国庆,吴晓东,等.煤层气井气水两相流动阶段流入动态研究[J].断块油气田,2011,18(4):502.
    [10]
    冯其红,舒成龙,张先敏,等.煤层气井两相流阶段排采制度实时优化[J].煤炭学报,2015,40(1):142.
    [11]
    倪小明,张崇崇,王延斌,等.单相水流阶段煤层气井裂隙水运移的临界裂隙尺寸数学模型[J].工程力学,2015,32(4):250-256.
  • Related Articles

    [1]WU Minjie. Application of unmanned aerial vehicle in the investigation of hidden disasters on coal mine surface[J]. Safety in Coal Mines, 2021, 52(11): 123-129.
    [2]LIU Jianguo, WANG Xingtao, SI Guobin. Study on mechanism of slope disaster in inner dump in Yimin Open-pit Mine[J]. Safety in Coal Mines, 2021, 52(3): 234-236.
    [3]WAN Zhongming, ZHU Tao, GAN Huaijun, DAI Feilong. Mechanism of Located-shifted Landslide in Weak Basement of Jiangjun Gobi No.2 Open-pit Coal Mine[J]. Safety in Coal Mines, 2020, 51(4): 77-80.
    [4]CHEN Yu, ZHOU Xihua. Analysis and Treatment of Slope Stability of Inner Dump in Heishan Open-pit Mine[J]. Safety in Coal Mines, 2019, 50(12): 231-233,238.
    [5]LIU Yufeng, LI Wei, MA Ming, ZHAO Ruhui. Optimization of Treatment Technology for Landslide in Yinwan Dump of Heidaigou Open-pit Mine[J]. Safety in Coal Mines, 2017, 48(9): 96-99.
    [6]FU Xiangchao. Failure Mechanism Research on Inner Dumping Site of Haerwusu Surface Mine[J]. Safety in Coal Mines, 2017, 48(6): 212-214,218.
    [7]SUN Xueyang, YANG Xu, LI Pengqiang, HE Tuoping, LI Cong, WU Jingfang. Influence of Mining on Landslide Disturbance Under the Same Inclination of Coal Measure Strata and Landslide[J]. Safety in Coal Mines, 2016, 47(10): 36-39.
    [8]LIU Shude, REN Hongwang, HUANG Yuejun, TIAN Rui. Application of FRT Biological Enzyme Road Building Technology in Field Management of Shengli Open-pit Coal Mine[J]. Safety in Coal Mines, 2015, 46(5): 238-240.
    [9]WU Bei-ping. Attention Points Before Safety Certification Field Evaluation for Mining Products[J]. Safety in Coal Mines, 2012, 43(10): 214-216.
    [10]Liu-Fei-fei, ZHAI Cheng, LI Fei, ZHOU Chao, ZHAO Shuai, ZHANG Qi-zhi. The Multidirectional Effects Investigation of Up-down Multiple Prediction Stratums Mining[J]. Safety in Coal Mines, 2012, 43(3): 104-106,107.
  • Cited by

    Periodical cited type(4)

    1. 陈晓轩,李彦斌,李立功. 高应力软岩巷道破坏特征及最佳支护技术研究. 煤炭技术. 2024(03): 36-41 .
    2. 蔡庆生,秦丽媛,王丽,付永志,冯永. 基于数值模拟分析弱胶结砂岩巷道的变形特征及优化支护研究. 呼伦贝尔学院学报. 2023(05): 110-116 .
    3. 孙利辉,宋家乐,贺庆丰,丁斌,彭世龙,熊怀鑫,杨贤达,杨本生. 深部巷道薄厚组合壳支护适用性模拟分析. 煤矿安全. 2022(07): 189-194+200 . 本站查看
    4. 韦庆亮,李彦斌,谷攀,张博. 深部高应力软岩巷道置孔释压材料置孔率合理性研究. 矿业研究与开发. 2020(04): 62-66 .

    Other cited types(0)

Catalog

    Article views (154) PDF downloads (2) Cited by(4)

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return