Citation: | MA Jinshan. Earned Value Method for Process Control of Coal Mining Safety Management Efficiency[J]. Safety in Coal Mines, 2018, 49(7): 241-244. |
[1] |
马金山,姬长生.煤矿安全管理效率研究[J].中国安全科学学报,2014,24(11):3-9.
|
[2] |
罗新星,苗维华.挣值法的理论基础和实践应用[J].中南大学学报(社会科学版),2003,5(3):369-372.
|
[3] |
De Marco A, Briccarello D, Rafele C. Cost and schedule monitoring of industrial building projects: case study[J]. Journal of Construction Engineering and Management, 2009, 135(9): 853-862.
|
[4] |
Kim Y, Ballard G. Management Thinking in the earned value method system and the last planner system[J]. Journal of Management in Engineering, 2010, 26(4): 223.
|
[5] |
Kim B, Reinschmidt K F. Probabilistic forecasting of project duration using bayesian inference and the beta distribution[J]. Journal of Construction Engineering and Management, 2009, 135(3): 178-186.
|
[6] |
Kim B, Reinschmidt K F. Probabilistic forecasting of project duration using kalman filter and the earned value method[J]. Journal of Construction Engineering and Management, 2010, 136(8): 834-843.
|
[7] |
马金山.基于挣值法的煤矿安全成本控制研究[J].煤炭经济研究,2010,30(8):89-91.
|
[8] |
陆宁,李霖,解燕平.建筑工程项目施工安全管理挣值法研究[J].中国安全科学学报,2013,23(3):145.
|
[9] |
赵丽丽.施工项目计划控制的研究[J].山西建筑,2008,34(6):235-251.
|
[10] |
梅晓宁,杨雪斌.基于挣值法的土石方工程安全成本控制研究[J].人民长江,2012,58(15):103-106.
|