DING Hang, GAO Zhenjun. Optimization on Roadway Tunneling Scheme by Driving and Bolting Machine in Bulianta Coal Mine[J]. Safety in Coal Mines, 2018, 49(S1): 110-112.
Citation: DING Hang, GAO Zhenjun. Optimization on Roadway Tunneling Scheme by Driving and Bolting Machine in Bulianta Coal Mine[J]. Safety in Coal Mines, 2018, 49(S1): 110-112.

Optimization on Roadway Tunneling Scheme by Driving and Bolting Machine in Bulianta Coal Mine

More Information
  • Published Date: July 29, 2018
  • For the current status of roadway tunneling effect by driving and bolting machine in Bulianta Coal Mine, the optimization analysis is carried out from the aspects of production succession adjustment, tunneling process, production system and labor organization; on the premise that the number is not increased and the total operation time is reduced, by adding the mating tunneling system, the operation mode is adjusted from “three-eight” system to the “two-eight” system. This paper fully optimizes the configuration of the operators, and effectively achieves the improvement of the driving footage, and then maximizes the tunneling potential of the driving and bolting machine.
  • [1]
    高云峰,江小军.浅谈我国煤矿巷道掘进装备技术[J].煤炭工程, 2010(10): 110 - 112.
    [2]
    王虹.我国煤矿巷道掘进技术和装备的现状与发展[J].煤炭科学技术, 2010, 38(1):57-62.
    [3]
    王虹.我国综合机械化掘进技术发展40a[J].煤炭学报,2010,35(11):1815-1820.
    [4]
    曹军,孙德宁.连续采煤机双巷掘进工艺及参数优化研究[J].煤炭科学技术,2012,40(5):9-13.
    [5]
    崔亚仲,白笠言.掘锚机在乌兰木伦矿的应用[J].煤炭科学技术,2004,32(7):25-28.
    [6]
    高振军.超厚煤层条件下煤巷掘进层位控制技术[J].煤炭技术,2017,36(11):93-95.
    [7]
    高振周,涂显赫.掘锚一体化在煤巷的应用[J].陕西煤炭,2011,30(3):104-106.
    [8]
    马超,代贵生,曹光明.快速掘进系统在大柳塔煤矿的应用[J].煤炭工程,2015,47(12):34-37.
    [9]
    汪腾蛟.新型高效单巷快速掘进系统应用及改进技术[J].煤炭科学技术,2014, 42(5):121-124.
    [10]
    张忠国.煤巷快速掘进系统的发展趋势与关键技术[J].煤炭科学技术,2016,44(1):55-60.
  • Related Articles

    [1]HE Haihong, MA Xiaohui, CHENG Hongtao, LI Jingkun, ZHANG Chaofan, DING Ziwei. Study on parameters optimization of fully mechanized excavation support in coal roadway based on empty roof theory[J]. Safety in Coal Mines, 2023, 54(1): 125-134.
    [2]LI Wangnian. Development of bolting machine on anchor excavator machine[J]. Safety in Coal Mines, 2021, 52(7): 138-141.
    [3]GUO Junsheng, LI Yuqi, XIE Miao. Application of single lane rapid driving technology in Xiegou Coal Mine[J]. Safety in Coal Mines, 2021, 52(6): 123-128.
    [4]JIA Yan. Characteristics of Mine-used Full-face Tunnel Boring Machine[J]. Safety in Coal Mines, 2019, 50(7): 168-171.
    [5]DAI Jiangjiao, HUANG Jiahai, LI Jun, CHENG Hang. Numerical Optimization of Fan Drum Parameters in Ventilation System of Drifting Tunnel[J]. Safety in Coal Mines, 2016, 47(2): 180-183.
    [6]WANG Zhijun. Improving Speed of Machine Digging in Hard Rock Roadway[J]. Safety in Coal Mines, 2015, 46(8): 131-134.
    [7]MA Wei. Optimization for Substep Three-dimensional Dust Control System at Fully Mechanized Excavation Face[J]. Safety in Coal Mines, 2015, 46(2): 82-84.
    [8]TAN Jun, YU Zhizhuo. Experiment on Blasting Parameters Optimization in Roadway Excavation with Large Section[J]. Safety in Coal Mines, 2015, 46(2): 50-53.
    [9]ZHANG Shuan-cai. 强矿压小煤柱分层掘进巷道高强联合支护技术[J]. Safety in Coal Mines, 2012, 43(10): 86-88.
    [10]XI Shu-wang. Application of Rock Lane Rapid Excavation Technology in Zhangcun Coal Mine[J]. Safety in Coal Mines, 2012, 43(4): 101-103.

Catalog

    Article views (318) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return