Working Face Filling Design of Underground Gasification Pilot Test
-
Graphical Abstract
-
Abstract
The filling scheme and filling process are proposed in this paper based on the filling principle and the actual detection results of Huating mining area.The problems in filling process(plugging) are analyzed,and the factors of affecting the filling effect are proposed.The practical application of whole ultra-high water materials filling and mixed filling in design process of Huating mining area are emphasized and analyzed.
-
-