Citation: | XUE Honglai, LI Jing, SHAO Shengyang, ZHAO Yuechao. Research on Optimizing Feeding Force Parameters of Deep-hole Directional Drilling of Coal Mine[J]. Safety in Coal Mines, 2017, 48(2): 156-159. |
[1] |
田成东,白海波.龙固煤矿延伸巷掘进防治水及底板注浆加固方案[J].煤矿安全,2015,46(6):136-138.
|
[2] |
王进尚,王一彤,蒋志刚.综采工作面长短钻孔配合浅孔抽放技术[J].煤矿安全,2015,46(2):54-56.
|
[3] |
方俊,陆军,张幼振,等.定向长钻孔精确探放矿井老空水技术及其应用[J].煤田地质与勘探,2015,43(2):101-105.
|
[4] |
林柏泉,李庆钊,杨威,等.基于千米钻机的“三软”煤层瓦斯治理技术及应用[J].煤炭学报,2011,36(12):1968-1973.
|
[5] |
陆军,熊克剑.近水平千米定向钻机在矿井瓦斯抽采中的应用[J].煤炭科学技术,2011,39(2):92-95.
|
[6] |
贺光会.千米钻机在寺河矿的应用[J].煤矿安全,2010,41(5):28-29.
|
[7] |
余大有,尹德战,孙家应,等.淮南刘庄煤矿定向水平井施工技术研究[J].中国煤炭地质,2010,22(10):71-73.
|
[8] |
赵耀江,谢生荣,温百根,等.高瓦斯煤层群顶板大直径千米钻孔抽采技术[J].煤炭学报,2009,34(6):797-801.
|
[9] |
刘基,赵忠证,丁湘.千米定向钻机在高压探放水中的应用研究[J].煤炭工程,2014,46(11):36-38.
|
[10] |
石浩,张杰.煤矿井下精确定向探放水技术[J].煤矿安全,2015,46(2):64-67.
|
[11] |
石智军,温榕,方俊,等.煤层井下定向钻进用随钻测量系统的研制[J].煤炭科学技术,2013,41(3):16-20.
|
[12] |
吴璋,孙荣军,韩士洲.沿煤层长钻孔定向钻进工艺技术试验研究[J].中国煤层气,2005,2(S1):38-40.
|
[13] |
王兆丰,田富超,赵彬,等.羽状千米长钻孔抽采效果考察试验[J].煤炭学报,2010,35(1):76-79.
|
[14] |
李乔乔,姚宁平,张杰.煤矿井下水平定向钻孔轨迹设计[J].煤矿安全,2011,42(12):51-54.
|
[1] | SHI Shuhan, WANG Qingfeng, XIN Dezhong, CHEN Hang, WAN Jun, CUI Xiaochao, WANG Xing. Simulation of colloidal slip with double friction force in automatic directional drilling[J]. Safety in Coal Mines, 2024, 55(10): 236-243. DOI: 10.13347/j.cnki.mkaq.20231644 |
[2] | Key technologies of N·m large-diameter directional drilling rig. Key technologies of 23 000 N·m large-diameter directional drilling rig[J]. Safety in Coal Mines, 2022, 53(4): 146-150. |
[3] | YAO Yafeng, YAO Ningping, SONG Haitao, PENG Tao. Design and analysis of long-stroke feeding device for drilling rig in underground coal mine[J]. Safety in Coal Mines, 2022, 53(3): 150-155. |
[4] | ZOU Zujie. Failure Analysis of Feeding Supporting Plate of Truck-mounted Drilling Rig and Optimization Design[J]. Safety in Coal Mines, 2019, 50(4): 132-134. |
[5] | PENG Tao, WANG Tianlong, YAO Yafeng. Design and Application of Hydraulic Chuck with Inclined Plane Force-enhancing[J]. Safety in Coal Mines, 2019, 50(3): 117-120. |
[6] | XIAO Donghui, Frank Hungerford, Steve Finch, SU Junkang, Chris Freer. Main Problems and Solutions for Inseam Holes over 2 000 m by VLD-1000 Rig[J]. Safety in Coal Mines, 2018, 49(8): 210-213. |
[7] | FAN Dong. Loop Analysis of Tunnel Core Drill Rig Pressure-reduced Drilling Based on AMEsim[J]. Safety in Coal Mines, 2017, 48(7): 138-140,144. |
[8] | DONG Hongjuan, ZHANG Jinshan, LI Wenzhe, WANG Yan. Research on Time Varying Laws of Extraction Radius for Bedding Directional 1 000 m Long Drilling[J]. Safety in Coal Mines, 2017, 48(3): 9-12. |
[9] | LIANG Chunmiao, WANG Yun. Development of Mine-used Shallow Hole Water Exploration and Drainage Drilling Rig[J]. Safety in Coal Mines, 2015, 46(3): 88-89,93. |
[10] | XIE Xiao-ping, FANG Xin-qiu, LIANG Min-fu. Gas Extraction Technology of Kilometer and Directional Drilling in the Roof[J]. Safety in Coal Mines, 2013, 44(7): 60-62. |