• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LI Ri-fu, WEN Guang-cai, SI Hu. Test of Coal Bed Gas Ground Well Extraction Technology in Mining Subsidence Area of Jincheng Mining Area[J]. Safety in Coal Mines, 2012, 43(8): 11-13.
Citation: LI Ri-fu, WEN Guang-cai, SI Hu. Test of Coal Bed Gas Ground Well Extraction Technology in Mining Subsidence Area of Jincheng Mining Area[J]. Safety in Coal Mines, 2012, 43(8): 11-13.

Test of Coal Bed Gas Ground Well Extraction Technology in Mining Subsidence Area of Jincheng Mining Area

More Information
  • Published Date: August 09, 2012
  • The coal bed gas ground well extraction test of mining subsidence area in 4308 working face of Chengzhuang coal mine in Jincheng city was done.Aiming at the geological characteristics of the test point,the body structure of test well was designed,and the drilling extraction datum before and after working face passed through were analyzed.The casing deformation were investigated four times.The test found that the extration pure flow of ground well reached to 8 m3/min.But,how to maintain the stability of casing is still a problem which should be resolved.
  • [1]
    D.N.Whittles,I.S.Lowndes,S.W.Kingman,et al.Thestability of methane capture boreholes around a long wallcoal panel[J].International Journal of Coal Geology,2007(71):313-328.
    [2]
    杨陆武,孙茂远,胡爱梅,等.适合中国煤层气藏特点的开发技术[J].石油学报,2002,23(4):46-50.
    [3]
    淮南矿业(集团)有限责任公司,煤炭科学研究总院重庆分院,澳大利亚联邦工业科学园.地面钻孔抽放采动区域瓦斯技术研究[R].淮南:淮南矿业(集团)有限责任公司,2006.
    [4]
    胡千庭,梁运培,林府进.采空区瓦斯地面钻孔抽采技术试验研究[J].中国煤层气,2006,3(2):3-6.
    [5]
    汪长明.地面钻孔抽采条件下半封闭采空区瓦斯运移及分布规律研究[D].重庆:煤炭科学研究总院重庆分院,2007.
    [6]
    孙海涛.采动影响下地面钻井的变形破坏机理研究[D].重庆:重庆大学,2008.
    [7]
    玉洲,陆庭侃,于海勇.地面钻孔抽放采空区瓦斯及其稳定性分析[J].岩石力学与工程学报,2005,24(增1):4982-4987.
  • Related Articles

    [1]LI Qiang, LI Wenming, ZHANG Ding. Safety Evaluation of Protective Bench in Northern End Slope of Haerwusu Open-Pit Coal Mine[J]. Safety in Coal Mines, 2018, 49(6): 229-232,241.
    [2]SHENG Lu. Research on Safety Protection of Coal Mine Automatic Production System in China Pingmei Shenma Group[J]. Safety in Coal Mines, 2018, 49(6): 108-111.
    [3]LIU Chungang, SUN Zhenping. Study on Strength of Hole Pretection by Casing for Large Diameter Drilling Extraction Borehole[J]. Safety in Coal Mines, 2017, 48(6): 20-23.
    [4]JIANG Sunlun, YAO Shanhua, REN Mingyuan. Monitoring System for Protective Device of Inclined Shaft Runaway Car in Coal Mine[J]. Safety in Coal Mines, 2016, 47(9): 117-119.
    [5]SONG Guodong. Runaway Car Protection System Based on Multi-master Communication Technology[J]. Safety in Coal Mines, 2016, 47(7): 122-124.
    [6]JIANG Zhennan, WANG Haoming. Sparks Protection and Maintenance for Mine-used Explosion-proof Enclosure[J]. Safety in Coal Mines, 2015, 46(3): 114-115.
    [7]ZHANG Shutao. Protecting Wall Design for Refuge Chamber in Underground Coal Mine[J]. Safety in Coal Mines, 2015, 46(1): 82-84,88.
    [8]YUAN Yafei, DENG Kazhong, LIU Hui, CHEN Bingqian. The Mining Failure Characteristics and Control Measures of High-grade Highway[J]. Safety in Coal Mines, 2014, 45(6): 218-221.
    [9]ZHOU Meng-ying, LIANG Guo-zhi. Personal Protection Technology in High Temperature Mine[J]. Safety in Coal Mines, 2013, 44(12): 82-84.
    [10]XUE Chun-yun. Discussion on Application Problem of Comprehensive Prevention and Control Measures for Coal and Gas Outburst[J]. Safety in Coal Mines, 2013, 44(3): 173-175.

Catalog

    Article views (990) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return