• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
LI Fuquan, WANG Xiao. Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft[J]. Safety in Coal Mines, 2016, 47(8): 129-132.
Citation: LI Fuquan, WANG Xiao. Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft[J]. Safety in Coal Mines, 2016, 47(8): 129-132.

Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft

More Information
  • Published Date: August 19, 2016
  • Taking double hook hoisting in auxiliary inclined shaft of Lucun No.2 Coal Mine as an example, we study various factors impacting auxiliary inclined shaft design, and determine the important parameters of auxiliary inclined shaft such as the position of mancar yard, storage yard, the track arrangement form of shaft through the relationship of influencing factors, which provides the integrated design thought and conception for double hook hoisting in auxiliary inclined shaft.
  • [1]
    孙祖明,伍小杰,张成忠,等.单线轨道双钩提升错动运行系统的研究与实现[J].金属矿山,2008(9):111-112.
    [2]
    国家安全生产监督管理局,国家煤矿安全监察局.煤矿安全规程[M].北京:煤炭工业出版社,2010.
    [3]
    杜计平.采矿学[M].徐州:中国矿业大学出版社,2009.
    [4]
    黄玉果.提升绞车爬绳咬绳的原因分析及技术对策[J].煤矿安全,2009,40(7):108-110.
    [5]
    刘劲军,张姗,张步斌,等.缠绕式提升机钢丝绳与天轮轮缘干涉的最大偏角的探讨[J].矿山机械,2013,41(12):38-42.
    [6]
    梁西会,赵会新.平衡轮在双钩提升系统中的应用探讨[J].矿山机械,2011,39(11):114-115.
    [7]
    曹金芳.斜井双钩提升安全管理综合防控技术[J].煤矿安全,2011,42(8):63-65.
    [8]
    张荣立,何国纬,李铎.采矿工程设计手册[M].北京:煤炭工业出版社,2003.
    [9]
    GB 50415—2007 煤矿斜井井筒及硐室设计规范[S].
    [10]
    万利平.副暗斜井提升设备计算与选型分析[J].淮北职业技术学院学报,2005,4(4):92-93.
  • Related Articles

    [1]HAN Jialiang, LIU Jianlin, TANG Shengli. Research on double-stage double-speed reaming drill bit for high-position and large-diameter drilling in coal mine roof[J]. Safety in Coal Mines, 2023, 54(9): 194-201. DOI: 10.13347/j.cnki.mkaq.2023.09.026
    [2]SHI Wenbao, ZHOU Wei, LI Zhenfu, PENG Xingqiu. Study on response characteristics of bolt bit drilling into sandstone[J]. Safety in Coal Mines, 2021, 52(4): 85-88.
    [3]LI Peng, MO Haitao, ZHANG Qiang, LI Zijian. Application of Reaming Drill Bit in Horizontal Directional Well[J]. Safety in Coal Mines, 2020, 51(1): 107-110.
    [4]LI Yanming, XIAO Lihui, XU Shubin, GUO Zhijun. Design of Special Drill Bit for Casing Drilling in Mining Stability Zone[J]. Safety in Coal Mines, 2019, 50(3): 89-91,95.
    [5]ZHANG Peng, WANG Chuanliu, FAN Yunlin, MA Yu. Development and Application of PDC Bit for Auger Drilling and Rapid Casing Running Technology[J]. Safety in Coal Mines, 2018, 49(8): 92-94,98.
    [6]GUO Hui. Type Selection of Drilling Bit for Large Diameter Drilling in Hanglaiwan Coal Mine[J]. Safety in Coal Mines, 2018, 49(3): 112-114.
    [7]ZHANG Rui. Parameters Optimization for External Nozzle of Reverse Circulation Sampling Drill Bit in Underground Coal Mine[J]. Safety in Coal Mines, 2017, 48(2): 101-104.
    [8]ZHAO Zhiqiang. Bottom Structural Parameters Optimization of Reverse Circulation Drill Bit[J]. Safety in Coal Mines, 2016, 47(3): 94-97.
    [9]ZHANG Tao, GUO Baoduo. Application of Drag PDC Bit in Gas Extraction Drilling of Coal Mine[J]. Safety in Coal Mines, 2015, 46(12): 96-97,100.
    [10]SUN Sheng, TANG Dayong, SUN Dai, ZHANG Ning. Design of Large Diameter Combined Drill Bit[J]. Safety in Coal Mines, 2014, 45(11): 95-97.

Catalog

    Article views (290) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return