• Chinese Core Periodicals
  • Chinese Core Journals of Science and Technology
  • RCCSE Chinese Authoritative Academic Journals
YANG Weili, JIANG Fuxing, YANG Peng. Study on Limit Recovery Ratio of Regional Island Coal Face in Coal Mine[J]. Safety in Coal Mines, 2015, 46(10): 36-39.
Citation: YANG Weili, JIANG Fuxing, YANG Peng. Study on Limit Recovery Ratio of Regional Island Coal Face in Coal Mine[J]. Safety in Coal Mines, 2015, 46(10): 36-39.

Study on Limit Recovery Ratio of Regional Island Coal Face in Coal Mine

More Information
  • Published Date: October 19, 2015
  • Determination of limit recovery ratio of regional island coal face in coal mine is a problem for the design of island mining. The mechanical model of stress distribution in island panels is built through analyzing overlying strata spatial structure evolution and the corresponding stress distribution during island panels mining, and based on this, the estimation method for the stress distribution of island coal mining face is given, then the limit recovery ratio is obtained combining with the distinguishing method for island panel recoverability. The proposed method is verified by field application.
  • [1]
    窦林名,何烨,张卫东.孤岛工作面冲击矿压危险及其控制[J].岩石力学与工程学报,2003,22(11):1866.
    [2]
    姜福兴,王同旭,汪华君,等.四面采空“孤岛”综放采场矿压控制的研究与实践[J].岩土工程学报,2005,27(9):1101-1104.
    [3]
    何富连,薄云山,吴焕凯,等.孤岛工作面回风巷围岩控制与支护技术[J].煤炭工程,2014,46(8):38-41.
    [4]
    张科学,郝云新,张军亮,等.孤岛工作面回采巷道围岩稳定性机理及控制技术[J].煤矿安全,2010(11):61-64.
    [5]
    秦忠诚,王同旭.深井孤岛综放面支承压力分布及其在底板中的传递规律[J].岩石力学与工程学报,2004,23(7):1127-1131.
    [6]
    汪华君,朱恒忠,张继华.大倾角下山孤岛煤柱安全开采实践[J].煤矿安全,2014(11):129-132.
    [7]
    姚庆华.孤岛煤柱冲击地压危险性评价研究[D].青岛:山东科技大学,2003:1-24.
    [8]
    王宏伟,姜耀东,杨忠东,等.长壁孤岛工作面煤岩冲击危险性区域多参量预测[J].煤炭学报,2012,37(11):1790-1794.
    [9]
    吴修光.大采深综放孤岛工作面矿压显现规律研究[J].山东煤炭科技,2011(1):171-173.
    [10]
    何烨,彭飞,胡学军,等.济二矿首例孤岛综放面冲击矿压监测治理[J].中国矿业大学学报,2004,33(5):569-572.
    [11]
    曹安业,窦林名,张小涛,等.某矿孤岛工作面冲击危险分析及其监测[J].煤炭工程,2007(2):70-72.
    [12]
    刘金海.深厚表土长大综放工作面顶板运动灾害控制研究[D].北京:北京科技大学,2012:53-59.
    [13]
    姜福兴,马其华.深部长壁工作面动态支承压力极值点的求解[J].煤炭学报,2002,27(3):273-275.
  • Related Articles

    [1]WANG Fei, WU Shiyue, LI Yankui, MENG Xiaohong, WANG Zhihao. Tracing Design Method of Pectinate Directional Borehole of Tunnels in Underground Mine[J]. Safety in Coal Mines, 2017, 48(1): 153-156.
    [2]GUO Mingtao, TANG Yuegang, SU Xuefeng. Estimating Coal-bed Methane Resource Based on Monte Carlo Method[J]. Safety in Coal Mines, 2016, 47(10): 153-156.
    [3]CHENG Zhanbo. Determination on Support Work Resistance for Fully Mechanized Caving Face with Multi-gangue Stratum[J]. Safety in Coal Mines, 2016, 47(4): 222-225.
    [4]YIN Wentao, FU Gui, ZHU Kai, GONG Jianxiang. Design and Implementation of Coal Mine Accident Prevention Behavior Safety Method[J]. Safety in Coal Mines, 2016, 47(3): 228-230,233.
    [5]GAO Zhenyong, ZHAO Yue, LI Rifu. Contrastive Analysis for Outburst Gas Amount Estimation Methods in Jiaozuo Mining Area[J]. Safety in Coal Mines, 2016, 47(3): 156-158,163.
    [6]CHENG Zhanbo. Load Estimation Method of Fully Mechanized Caving Face Support[J]. Safety in Coal Mines, 2015, 46(12): 210-213.
    [7]ZHANG Denglong, ZENG Youfu. Analysis of CO Over Limit at Top Corner of 1121 Fully Mechanized Caving Face and Its Prevention Methods in Changshanzi Coal Mine[J]. Safety in Coal Mines, 2014, 45(7): 159-162.
    [8]LI Quanxin. Design and Calculation Method of Directional Borehole Trajectory in Coal Mine Underground[J]. Safety in Coal Mines, 2014, 45(2): 141-144.
    [9]FENG Jun-fa, TIAN Qu-zhen, YANG Hu-xiong. Design Method for Upper Forward Plane Station in Mining Area[J]. Safety in Coal Mines, 2013, 44(6): 211-213.
    [10]ZHANG Fei-yan, HAN Ying, YANG Zhi-long. An Estimation Method of Mechanical Parameters for Soft Coal[J]. Safety in Coal Mines, 2013, 44(4): 13-15.

Catalog

    Article views (301) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return