SHEN Mingzhu, DUAN Hongfei. Determination of Reasonable Width for Goaf-side Driving Segment Coal Pillar at Fully Mechanized Caving Face of Ultra-thick Coal Seam[J]. Safety in Coal Mines, 2014, 45(12): 207-210.
Citation: SHEN Mingzhu, DUAN Hongfei. Determination of Reasonable Width for Goaf-side Driving Segment Coal Pillar at Fully Mechanized Caving Face of Ultra-thick Coal Seam[J]. Safety in Coal Mines, 2014, 45(12): 207-210.

Determination of Reasonable Width for Goaf-side Driving Segment Coal Pillar at Fully Mechanized Caving Face of Ultra-thick Coal Seam

More Information
  • Published Date: December 19, 2014
  • In order to improve the stability of the wall rock around the goaf-side driving roadway and the utilization rate of coal resources, Tashan Coal Mine of Datong mining area was taken as the research object, the reasonable width of segment coal-pillar for the goaf-side driving in fully mechanized caving face of ultra-thick coal seam was studied in this paper. At first, the theoretical analysis of reasonable width of segment coal pillar was carried out, then the mechanical models of goaf-side segment coal pillars in different widths were established by numerical software FLAC3D. The results of numerical stimulation showed that when the width of segment coal-pillar was from 5 m to 10 m, the roadway was in the low stress area and the support would be relatively stable. Finally, combined theoretical calculations with numerical simulation, referring to the ground pressure law and the results of micro-seismic monitoring in fully mechanized caving face of Tashan Coal Mine, considering the roadway span, isolated goaf gas and other safety factors, it was determined that the reasonable width of segment coal pillar was 8 m.
  • [1]
    高明仕,张农,成隆.综放沿空掘巷窄煤柱合理宽度的确定[J].矿山压力与顶板管理,2004(3):4-7.
    [2]
    钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003:201-204.
    [3]
    杨吉平.沿空掘巷合理窄煤柱宽度确定与围岩控制技术[J].辽宁工程技术大学学报,2012,32(1):39-43.
    [4]
    韩承强,张开智,徐小兵,等.区段小煤柱破坏规律及合理尺寸研究[J].采矿与安全工程学报,2007,24(3):370-373.
    [5]
    柏建彪,王卫军,候朝炯,等.综放沿空掘巷围岩控制机理及支护技术研究[J].煤炭学报,2000,25(5):478-481.
    [6]
    宋振骐.实用矿山压力[M].徐州:中国矿业大学出版社,1988:41-78.
    [7]
    成云海,姜福兴,庞继禄.特厚煤层综放开采采空区侧向矿压特征及应用[J].煤炭学报,2012,37(7):1088-1093.
    [8]
    候朝炯,马念杰.煤层巷道两帮煤体应力和极限平衡区的探讨[J].煤炭学报,1989,14(4):21-29.
    [9]
    谢广祥,杨科,刘全明.综放面倾向支承压力分布规律研究[J].岩石力学与工程学报,2006,25(3):545.
    [10]
    孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2009,34(7):55-59.
  • Related Articles

    [1]ZHAO Zhipeng, OUYANG Feng, HE Fulian, XU Xuhui, YANG Yang, XU Ruiyang. Study on key parameters of bidirectional shaped charge blasting for gob side entry retaining with roof cutting and pressure relief[J]. Safety in Coal Mines, 2022, 53(2): 226-233.
    [2]SHI Qipeng, ZHENG Hongyun, WANG Yongbao, YUN Ming, WU Shanyuan, LI Tingchun, ZHANG Hao. Study on parameters of blast hole spacing for gob side entry retaining by bidirectional shaped charge blasting[J]. Safety in Coal Mines, 2022, 53(1): 219-225.
    [3]AN Yuanying. Numerical Simulation Research on Mechanism of Cracks Formation Induced by Pre-splitting Blasting and Its Application[J]. Safety in Coal Mines, 2018, 49(5): 178-182.
    [4]LYU Zhaohai, ZHAO Changhong, CAO Jiantao, HAI Xueyi, WANG Xiaojun, YUE Xiaojun. Study on Blasting and Slope Stability of Open-pit Mining Under High Temperature Fire Occurrence Mode[J]. Safety in Coal Mines, 2017, 48(7): 162-165.
    [5]LIU Li, LI Shugang, LIU Chao, XING Lijie. Drilling Holes Spacing Optimization for Breaking Roof Blasting Pressure Releasing in Deep Hole of Jixian Coal Mine[J]. Safety in Coal Mines, 2015, 46(10): 137-139.
    [6]TAN Jun, YU Zhizhuo. Experiment on Blasting Parameters Optimization in Roadway Excavation with Large Section[J]. Safety in Coal Mines, 2015, 46(2): 50-53.
    [7]LIU Yufu, WANG Zhenwei. Safety Evaluation and Data Analysis of Slope Blasting Vibration in Haerwusu Open-pit Coal Mine[J]. Safety in Coal Mines, 2014, 45(6): 215-217,221.
    [8]CAO Zhi'an, GAO Mingshi, LI Yulong, CHEN Xi. Blasting Parameter Optimization and Practice in Large Section Rock Roadway[J]. Safety in Coal Mines, 2014, 45(6): 166-169.
    [9]SANG Zong-qi, ZHAO Yao-zhou, YANG Ze-jin. Research on the Similarity of Throwing Distance in On-site Blasting Model Test[J]. Safety in Coal Mines, 2013, 44(7): 54-56.
    [10]LI Xian-zhong, LIN Bai-quan, YANG Wei, NI Guan-hua, LI Quan-gui. High-low-blasting Technology Based on Multi-parameters Cooperative in Gas Dynamic Disaster Prevention[J]. Safety in Coal Mines, 2013, 44(4): 84-87.

Catalog

    Article views (468) PDF downloads (0) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return