HONG Huang. Plugging for Damaged Drainage Hole in the Fourth Aquifer of Qidong Coal Mine Unconsolidated Formation[J]. Safety in Coal Mines, 2014, 45(11): 116-117,121.
    Citation: HONG Huang. Plugging for Damaged Drainage Hole in the Fourth Aquifer of Qidong Coal Mine Unconsolidated Formation[J]. Safety in Coal Mines, 2014, 45(11): 116-117,121.

    Plugging for Damaged Drainage Hole in the Fourth Aquifer of Qidong Coal Mine Unconsolidated Formation

    • To ensure the safety of Qidong Coal Mine 7131 working face, we need to plug 32# drainge hole ar airway. However, the hole is unable to use the original casing to grout and plug due to the quality problems. Using hole casing, grouting and other methods to inject aggregate, we successfully plug the damaged drainage hole.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return