LI Hongxing, DING Guoli, ZHANG Xiaoqiang, LIU Yuedong. Reasonable Malposition for Mining Roadway Outward Staggered Arrangement in Very Close Distance Coal Seam[J]. Safety in Coal Mines, 2014, 45(7): 41-44.
    Citation: LI Hongxing, DING Guoli, ZHANG Xiaoqiang, LIU Yuedong. Reasonable Malposition for Mining Roadway Outward Staggered Arrangement in Very Close Distance Coal Seam[J]. Safety in Coal Mines, 2014, 45(7): 41-44.

    Reasonable Malposition for Mining Roadway Outward Staggered Arrangement in Very Close Distance Coal Seam

    • Aiming at the problems of 10# and 11# close distance coal seams during combined mining in Luzigou Mine of Shanxi Coal Transportation and Marketing Group. Through field investigation, laboratory test, theoretical analysis, mechanical model caculation and numerical simulation combined method, this article studied the failure of coal pillar width, the stability of coal pillar and support pressure distribution and coal pillar support pressure on the floor. By FLAC3D simulation software, it determined that the reasonable malposition arrangement for the combined mining is 9 m.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return