LIU Shujie. Influencing Factors Analysis of Ground Pre-grouting and Stopping Slurry in Kilometer Deep Hole Based on Factor Analysis[J]. Safety in Coal Mines, 2014, 45(3): 145-149.
    Citation: LIU Shujie. Influencing Factors Analysis of Ground Pre-grouting and Stopping Slurry in Kilometer Deep Hole Based on Factor Analysis[J]. Safety in Coal Mines, 2014, 45(3): 145-149.

    Influencing Factors Analysis of Ground Pre-grouting and Stopping Slurry in Kilometer Deep Hole Based on Factor Analysis

    • The effect factors in the process of kilometer deep hole ground pre-grouting construction were analyzed in consideration of the diversity and complexity of stopping slurry construction by utilizing the method of factor analysis. Three public factors including geological factor (F1), grouting parameters influencing factor (F2) and stopping slurry targets factor (F3) on behalf of the success rate in stopping slurry construction were extracted. As a case, the analysis of ground pre-grouting construction in Xinhu Coal Mine was carried out for Bozhou Coal, in which the feasibility of the proposed method was verified by utilizing the method of Factor Analysis.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return