Citation: | WANG Lei, ZHANG Xianni, GUO Guangli, ZHA Jianfeng. The Strata Movement Model for Solid Compacted Backfilling Based on Structure Key Layer[J]. Safety in Coal Mines, 2014, 45(3): 16-20. |
[1] |
缪协兴,张吉雄,郭广礼.综合机械化固体废物充填采煤方法与技术[M].徐州:中国矿业大学出版社,2010.
|
[2] |
郭广礼,缪协兴,查剑锋,等.长壁工作面矸石充填开采沉陷控制效果的初步分析[J].中国科技论文在线,2008(11):805-809.
|
[3] |
缪协兴,张吉雄,郭广礼. 综合机械化固体充填采煤方法与技术研究[J].煤炭学报,2010,35(1):1-6.
|
[4] |
查剑锋.矸石充填开采沉陷控制基础问题研究[D].徐州:中国矿业大学,2008.
|
[5] |
张吉雄.矸石直接充填综采岩层移动控制及其应用研究[D].徐州:中国矿业大学,2008.
|
[6] |
缪协兴,陈荣华,白海波.保水开采隔水关键层的基本概念及力学分析[J].煤炭学报,2007,32(6):561-564.
|
[7] |
王磊.固体密实充填开采岩层移动机理及变形预测研究[D].徐州:中国矿业大学,2012.
|
[8] |
钱鸣高,缪协兴,许家林,等.岩层控制的关键层理论[M].徐州:中国矿业大学出版社,2003.
|
[9] |
中国矿业大学,济宁矿业集团有限公司,兖州煤业股份有限公司,平顶山天安煤业股份有限公司.固体密实充填开采岩层控制理论与实践鉴定材料[R].徐州:中国矿业大学,2011.
|
[1] | HE Haihong, MA Xiaohui, CHENG Hongtao, LI Jingkun, ZHANG Chaofan, DING Ziwei. Study on parameters optimization of fully mechanized excavation support in coal roadway based on empty roof theory[J]. Safety in Coal Mines, 2023, 54(1): 125-134. |
[2] | LI Wangnian. Development of bolting machine on anchor excavator machine[J]. Safety in Coal Mines, 2021, 52(7): 138-141. |
[3] | GUO Junsheng, LI Yuqi, XIE Miao. Application of single lane rapid driving technology in Xiegou Coal Mine[J]. Safety in Coal Mines, 2021, 52(6): 123-128. |
[4] | JIA Yan. Characteristics of Mine-used Full-face Tunnel Boring Machine[J]. Safety in Coal Mines, 2019, 50(7): 168-171. |
[5] | DAI Jiangjiao, HUANG Jiahai, LI Jun, CHENG Hang. Numerical Optimization of Fan Drum Parameters in Ventilation System of Drifting Tunnel[J]. Safety in Coal Mines, 2016, 47(2): 180-183. |
[6] | WANG Zhijun. Improving Speed of Machine Digging in Hard Rock Roadway[J]. Safety in Coal Mines, 2015, 46(8): 131-134. |
[7] | MA Wei. Optimization for Substep Three-dimensional Dust Control System at Fully Mechanized Excavation Face[J]. Safety in Coal Mines, 2015, 46(2): 82-84. |
[8] | TAN Jun, YU Zhizhuo. Experiment on Blasting Parameters Optimization in Roadway Excavation with Large Section[J]. Safety in Coal Mines, 2015, 46(2): 50-53. |
[9] | ZHANG Shuan-cai. 强矿压小煤柱分层掘进巷道高强联合支护技术[J]. Safety in Coal Mines, 2012, 43(10): 86-88. |
[10] | XI Shu-wang. Application of Rock Lane Rapid Excavation Technology in Zhangcun Coal Mine[J]. Safety in Coal Mines, 2012, 43(4): 101-103. |