TANG Zhilong, YANG Xiangqin, LIU Yufeng, YANG Yongkang. Numerical Testing of Narrow Coal Pillar Width Identified With Large Section Roadway Driving Along Next Goaf[J]. Safety in Coal Mines, 2014, 45(1): 29-31,35.
Citation: TANG Zhilong, YANG Xiangqin, LIU Yufeng, YANG Yongkang. Numerical Testing of Narrow Coal Pillar Width Identified With Large Section Roadway Driving Along Next Goaf[J]. Safety in Coal Mines, 2014, 45(1): 29-31,35.

Numerical Testing of Narrow Coal Pillar Width Identified With Large Section Roadway Driving Along Next Goaf

More Information
  • Published Date: January 19, 2014
  • Aiming at the problem of narrow coal pillar width identified with large section roadway driving along next goaf in fully mechanized caving face, the different widths of narrow coal pillar deformation and stress distribution were studied by using numerical test method in the paper, the reasonable narrow coal pillar width was determined and successfully applied to engineering practice. Some conclusions can be drawn as follows: when the width of coal pillar was 3 m, 4 m, 5 m, 6 m, 8 m and 10 m, the non-yield destruction coal pillar width was 0 m, 0 m, 1 m, 2.6 m, 4.8 m and 7 m; the stress distribution of narrower coal pillar is approximate triangular, and the little bigger coal pillar is approximate trapezoidal distribution; the triangular distribution are overlapping results of both sides vertical stress peak. The middle stress of trapezoidal distribution is lower, because of mining and tunneling influence smaller; the displacement of the coal pillar to the roadway was increased with pillar width, then from big to small when it was up to a certain extent, finally tended to be stable; the 5 m coal pillar was chosen as the pillar's better stress condition, and the necessary strengthen supporting measures can meet the needs of engineering.
  • [1]
    柏建彪.沿空掘巷围岩控制[M].徐州:中国矿业大学出版社,2006.
    [2]
    柏建彪,侯朝炯,黄汉富.沿空掘巷窄煤柱稳定性数值模拟[J].岩石力学与工程学报,2004,23(20):3475-3479.
    [3]
    王春雷,柏建彪,庞美俊,等. 沿空掘巷窄煤柱合理宽度的研究[J].煤炭科技,2008(4):1-3.
    [4]
    王卫军,侯朝炯,柏建彪.综放沿空巷道顶煤受力变形分析[J].岩土工程学报,2001,23(2):209-211.
    [5]
    Whittaker B N. Design and stability of pillar in long wall mining[J].Mining Engineer,1979(13):68-72.
    [6]
    刘增辉,康天合.综放煤巷合理煤柱尺寸的物理模拟研究[J].矿山压力与顶板管理,2005(1):24-26.
    [7]
    张农,李学华,高明仕.迎采动工作面沿空掘巷预拉力支护及工程应用[J].岩石力学与工程学报,2004,23(12):2100-2105.
    [8]
    李伟,冯增强.南屯煤矿深部沿空巷道耦合支护技术[J].辽宁工程技术大学学报:自然科学版,2008,27(5):683-685.
    [9]
    张开智,韩承强,李大勇,等. 大小护巷煤柱巷道采动变形与小煤柱破坏演化规律[J].山东科技大学学报:自然科学版,2006,25(4):6-9.
    [10]
    杨永康,李建胜,康天合,等.浅埋厚基岩松软顶板综放采场矿压特征工作面长度效应[J].岩土工程学报,2012,34(4):709-716.