Citation: | GUAN Jun-cai, JU Jin-feng. Study on Top Coal Caving and Drawing Characteristics at Fully Mechanized Caving Mining in Shallow Extreme Thick Seams of Yuanbao Coal Mine[J]. Safety in Coal Mines, 2013, 44(11): 56-59. |
[1] |
杨振复,罗恩波.放顶煤开采技术与放顶煤液压支架[M].北京:煤炭工业出版社,1995.
|
[2] |
陈忠辉,谢和平,林忠明. 综放开采顶煤冒放性的损伤力学分析[J].岩石力学与工程学报,2002,21(8):1136-1140.
|
[3] |
靳钟铭. 放顶煤开采理论与技术[M].北京:煤炭工业出版社,2001.
|
[4] |
宋选民,靳钟铭,康天合. 放顶煤开采顶煤冒放性影响规律研究[J].山西矿业学院学报,1995,13(3):264-271.
|
[1] | ZHAO Zhipeng, OUYANG Feng, HE Fulian, XU Xuhui, YANG Yang, XU Ruiyang. Study on key parameters of bidirectional shaped charge blasting for gob side entry retaining with roof cutting and pressure relief[J]. Safety in Coal Mines, 2022, 53(2): 226-233. |
[2] | SHI Qipeng, ZHENG Hongyun, WANG Yongbao, YUN Ming, WU Shanyuan, LI Tingchun, ZHANG Hao. Study on parameters of blast hole spacing for gob side entry retaining by bidirectional shaped charge blasting[J]. Safety in Coal Mines, 2022, 53(1): 219-225. |
[3] | AN Yuanying. Numerical Simulation Research on Mechanism of Cracks Formation Induced by Pre-splitting Blasting and Its Application[J]. Safety in Coal Mines, 2018, 49(5): 178-182. |
[4] | LYU Zhaohai, ZHAO Changhong, CAO Jiantao, HAI Xueyi, WANG Xiaojun, YUE Xiaojun. Study on Blasting and Slope Stability of Open-pit Mining Under High Temperature Fire Occurrence Mode[J]. Safety in Coal Mines, 2017, 48(7): 162-165. |
[5] | LIU Li, LI Shugang, LIU Chao, XING Lijie. Drilling Holes Spacing Optimization for Breaking Roof Blasting Pressure Releasing in Deep Hole of Jixian Coal Mine[J]. Safety in Coal Mines, 2015, 46(10): 137-139. |
[6] | TAN Jun, YU Zhizhuo. Experiment on Blasting Parameters Optimization in Roadway Excavation with Large Section[J]. Safety in Coal Mines, 2015, 46(2): 50-53. |
[7] | LIU Yufu, WANG Zhenwei. Safety Evaluation and Data Analysis of Slope Blasting Vibration in Haerwusu Open-pit Coal Mine[J]. Safety in Coal Mines, 2014, 45(6): 215-217,221. |
[8] | CAO Zhi'an, GAO Mingshi, LI Yulong, CHEN Xi. Blasting Parameter Optimization and Practice in Large Section Rock Roadway[J]. Safety in Coal Mines, 2014, 45(6): 166-169. |
[9] | SANG Zong-qi, ZHAO Yao-zhou, YANG Ze-jin. Research on the Similarity of Throwing Distance in On-site Blasting Model Test[J]. Safety in Coal Mines, 2013, 44(7): 54-56. |
[10] | LI Xian-zhong, LIN Bai-quan, YANG Wei, NI Guan-hua, LI Quan-gui. High-low-blasting Technology Based on Multi-parameters Cooperative in Gas Dynamic Disaster Prevention[J]. Safety in Coal Mines, 2013, 44(4): 84-87. |