ZHANG Ming-hua, GAO Ming-shi, LI Yu-long, CHEN Xi. One Time Blasting Method of Full-face in Large Section Rock-roadway[J]. Safety in Coal Mines, 2013, 44(7): 144-146,150.
    Citation: ZHANG Ming-hua, GAO Ming-shi, LI Yu-long, CHEN Xi. One Time Blasting Method of Full-face in Large Section Rock-roadway[J]. Safety in Coal Mines, 2013, 44(7): 144-146,150.

    One Time Blasting Method of Full-face in Large Section Rock-roadway

    • The number of detonators was large, the series network with FD200 type exploder could not guarantee network quasi-explosive in one time blasting of full-face in large section rock-roadway, according to these problems, by calculating the parameters of the potential explosion, ground simulation test, it studied quasi-explosive conditions of blasting network. It introduced firing impulse K as testing key parameters of detonators quasi-explosive, and tested different connection method of blasting network to seek optimal connection method of one time blasting technology which was suitable for full-face. The results showed that for one time blasting 92 detonators of full-face, series parallel connection with two branches could guarantee network one time blasting successful.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return