Citation: | SHEN Peng-yi, WANG Bing. Specific Pressure Test for Floor in 2201 Working Face of Songshan Coal Mine and Adaptability Analysis of Mechanized Caving Four-pillar Support on Floor[J]. Safety in Coal Mines, 2013, 44(5): 202-205. |
[1] |
秦怡军.液压支架对底板的比压研究[J].煤矿机电,1998(5):13-15.
|
[2] |
孙光中,郭冰冰,郭中杰.松软煤层底板比压测试及其控制对策研究[J].有色金属,2010,62(5):31-33.
|
[3] |
钱鸣高,石平五.矿山压力及岩层控制[M].徐州:中国矿业大学出版社,2003:149-151.
|
[4] |
邹德蕴,石伟,张开智,等.底板比压测试技术[J].矿山压力与顶板管理,2001(2):74-76.
|
[5] |
杨振复,罗恩波.放顶煤开采技术与放顶煤液压支架[M].北京:煤炭工业出版社,1995:184-186.
|