Citation: | XU Xiaodi, GUO Zhongping, WANG Rui. Mine mining plan regulation system based on dynamic deduction[J]. Safety in Coal Mines, 2024, 55(2): 228−234. DOI: 10.13347/j.cnki.mkaq.20230980 |
Mine mining plan preparation is an important work in the production management of mining enterprises. The traditional manual preparation of mining plan is not well adapted to the increasingly complex coal mine production environment, which leads to problems such as tight mining succession. Therefore, a mine mining plan control system is designed based on dynamic inference. This system adopts the dynamic planning method, according to the characteristics and requirements of mining production, establishes a dynamic deduction model, calculates the appropriate production cycle and the amount of coal to be mined in each quarter, and realizes the dynamic deduction of the mining process with the help of the database model of GIS and software such as AutoCAD. In order to cope with the situation that the production plan can not be completed on time, by setting up the outline level and setting the connection relationship between different tasks, the problem of tense mining succession is effectively avoided, and optimization calculations are realized with the help of computers to achieve the dynamic regulation of the mine mining plan.
[1] |
贾明涛,潘长良,谢学斌. 深井矿山回采过程模拟及调控研究[J]. 湘潭矿业学院学报,2003(3):9−12.
JIA Mingtao, PAN Changliang, XIE Xuebin. The simulation and control of the exploitation processes in a deeper deposit[J]. Journal of Xiangtan Mining College, 2003(3): 9−12.
|
[2] |
蒋成荣,彭平安,王李管. 基于模拟开采技术的地下矿山三维可视化生产计划编制[J]. 中国矿业,2015,24(8):152−156.
JIANG Chengrong, PENG Pingan, WANG Liguan. 3D visualization production planning in underground mining based on smulating technology[J]. China Mining Magazine, 2015, 24(8): 152−156.
|
[3] |
王玉浚,彭建良. 矿井增产的基本依据和合理界限−采区和工作面接替模型及其应用[J]. 中国矿业学院学报,1988(4):39−46.
|
[4] |
靳智明,韦玉飞. 基于DIMINE的露天煤矿中长期计划编制技术[J]. 内蒙古科技与经济,2019(17):98−101.
|
[5] |
刘定一,王李管,陈鑫,等. 地下矿中长期计划多目标优化及应用研究[J]. 黄金科学技术,2018,26(2):228−233.
LIU Dingyi, WANG Liguan, CHEN Xin, et al. Study on multi objective optimization and application of medium andlong term plan for underground mine[J]. Gold Science and Technology, 2018, 26(2): 228−233.
|
[6] |
李国清,侯杰,胡乃联. 地下矿山生产接续与设备调度集成优化模型[J]. 工程科学学报,2018,40(9):1050−1057.
LI Guoging, HOU Jie, HU Nailian. Integrated optimization model for production and equipment dispatching in underground mines[J]. Chinese Journal of Engineering, 2018, 40(9): 1050−1057.
|
[7] |
顾清华,吕艳红,卢才武,等. 多金属露天矿多目标生产计划优化问题建模及求解算法[J]. 金属矿山,2020(4):147−153.
GU Qinghua, LYU Yanhong, LU Caiwu, et al. Modeling and algorithm of multi-objective production scheduling optimization for multi-metal open-pit mine[J]. Metal Mine, 2020(4): 147−153.
|
[8] |
顾清华,马龙,卢才武,等. 露天矿山企业长期生产计划模型与优化算法[J]. 工业工程与管理,2020,25(1):38−52.
GU Qinghua, MA Long, LU Caiwu, et al. Long-term mining production scheduling model and optimization algorithm for open-pit mine enterprises[J]. Industrial Engineering and Management, 2020, 25(1): 38−52.
|
[9] |
KUMRAL M. Production planning of mines: Optimisation of block sequencing and destination[J]. International Journal of Mining Reclamation & Environment, 2012, 26(2): 93−103.
|
[10] |
ROY S, MOHANTY R P. Optimising a production plan for underground coal mining: a genetic algorithm application[J]. International Journal of Operational Research, 2021, 41(3): 423−445. doi: 10.1504/IJOR.2021.116264
|
[11] |
任助理,毕林,王李管,等. 基于混合整数规划法的自然崩落法放矿计划优化[J]. 工程科学学报,2017,39(1):23−30.
REN Zhuli, BI Lin, WANG Liguan, et al. Optimization of drawing scheduling based on mixed integer programming in block cave mining[J]. Chinese Journal of Engineering, 2017, 39(1): 23−30.
|
[12] |
谭正华,文阳,王李管,等. 基于关键链的地下矿采掘计划编制优化方法[J]. 黄金科学技术,2021,29(4):602−611.
TAN Zhenghua, WEN Yang, WANG Liguan, et al. Optimization method for preparation of underground mining plan based on critical chain[J]. Gold Science and Technology, 2021, 29(4): 602−611.
|
[13] |
涂鸿渐,王李管,陈鑫,等. 基于混合整数规划法的露天矿配矿品位控制[J]. 黄金科学技术,2019,27(3):458−465.
TU Hongjian, WANG Liguan, CHEN Xin, et al. Ore grade control blending in open-pit mine based on mixed integer programming[J]. Gold Science and Technology, 2019, 27(3): 458−465.
|
[14] |
迟宝锁,王强,高彬. 基于GIS的采掘接续编排预警系统[J]. 煤矿安全,2021,52(2):138−141.
CHI Baosuo, WANG Qiang, GAO Bin. A mining-excavation relay compilation warning system based on GIS[J]. Safety in Coal Mines, 2021, 52(2): 138−141.
|
[15] |
马龙,卢才武,顾清华. 多金属矿山工业采掘生产计划模型与优化算法[J]. 工业工程与管理,2018,23(3):50−56.
MA Long, LU Caiwu, GU Qinghua. Mining production scheduling model and optimization algorithm for multi-metal mine industry[J]. Industrial Engineering and Management, 2018, 23(3): 50−56.
|
[16] |
赵慧杰,刘光旭,魏瑾瑜. 甘特图技术辅助煤矿采掘接续计划管理的探索[J]. 山东煤炭科技,2020(7):193−194.
ZHAO Huijie, LIU Guangxu, WEI Jinyu. Exploration of Gantt chart technology to assist the management of coal mining succession plan[J]. Shandong Coal Science and Technology, 2020(7): 193−194.
|
[17] |
何勇,张华,房武彬,等. 基于GIS的煤矿采掘衔接图表联动方法[J]. 煤矿安全,2014,45(9):123−125.
HE Yong, ZHANG Hua, FANG Wubin, et al. Chart linkage method for coal mine mining-excavation relay based on GIS[J]. Safety in Coal Mines, 2014, 45(9): 123−125.
|
[1] | ZHAO Yongfang, ZHANG Lingyun, YU Liya. Safety Evaluation for Rock Burst Based on Entropy-weight and Matter-element Extension Model[J]. Safety in Coal Mines, 2019, 50(6): 213-218. |
[2] | LIANG Yunpei, ZHANG Yangyang, LI Quangui, ZHOU Lishuang. Attribute Synthetic Evaluation Model Based on Combined Weight for Predicting Risk of Coal and Gas Outburst[J]. Safety in Coal Mines, 2019, 50(1): 184-187. |
[3] | PENG Xiandu, LI Shufang, ZHANG Ziwei. Fuzzy Extension Matter-element Evaluation Model of Mine Rescue Capability[J]. Safety in Coal Mines, 2018, 49(12): 242-244,248. |
[4] | LUO Zhenmin, LI Kui, AN Yafei, LI Haitao, FU Wen. Risk Assessment of Gas Explosion Based on Improved Catastrophe Progression Method[J]. Safety in Coal Mines, 2018, 49(6): 246-250. |
[5] | ZHU Yanqiu, YANG Li. Evaluation Model on Emergency Management Capability of Coal Mine Based on Scattering Degree Method and Support Vector Machine[J]. Safety in Coal Mines, 2017, 48(2): 226-229,233. |
[6] | WANG Lu, LI Shugang, CHENG Lianhua, ZHANG Liang. Assessment Index System of Coal Mine Emergency Ability Based on PDCA Model[J]. Safety in Coal Mines, 2014, 45(8): 241-244. |
[7] | TAN Zhanglu, ZHANG Changlu. Coal Mine Emergency Response Capability Based on Extension Superiority Evaluation Method[J]. Safety in Coal Mines, 2014, 45(4): 215-218. |
[8] | SONG Jin-xing, WANG Sheng-rong. Catastrophe Progression Method for Coal and Gas Outburst Risk Comprehensive Evaluation[J]. Safety in Coal Mines, 2013, 44(10): 149-152. |
[9] | ZHANG Shu-jin, LI Shao-quan, LI Shu-qing, XIE Qing-xue. Technology Maturity Evaluation of Gas Drainage in Coal Mine Based on AHP[J]. Safety in Coal Mines, 2013, 44(9): 169-172. |
[10] | XU Feng, QIN Cheng. Study on Emergency Response Capability Evaluation of Coal Mine Water Disaster[J]. Safety in Coal Mines, 2012, 43(9): 26-29. |
1. |
李卓,孙屹,姜鑫,蒋景东. 低围压与不同温度作用下土石坝护坡土石混合体力学特性. 河海大学学报(自然科学版). 2024(06): 90-96 .
![]() |