塔山矿特厚煤层综放开采瓦斯综合治理

    Gas Comprehensive Treatment of Fully Mechanized Top-coal Caving in Tashan Special Thick Coal Seam

    • 摘要: 塔山煤矿放顶煤开采平均14.81 m特厚煤层,工作面上隅角及回风流瓦斯成为制约综采工作面安全生产的关键因素。集团公司及塔山煤矿与中煤科工集团重庆研究院和沈阳研究院联合攻关,采用抽放等多种手段防治瓦斯,取得了良好效果,保证了安全生产。

       

      Abstract: Gas in upper corner and return current of Tashan coal mine working face,the thick coal seam caving mining is an average of 14.81 m,is the key factor which restricted safety production in mechanized mining face.Group companies and Tashan coal mine cooperated with Chongqing and Shenyang institute of China Coal Technology & Engineering Group CORP in to achieved good results and ensured safe production by using gas drainage and other means.

       

    /

    返回文章
    返回