冲击危险区迎采沿空巷道切顶护巷防冲技术
Preventing rock burst technology by roof cutting and roadway protection in mining along goaf roadway of dangerous area
-
摘要: 为了解决张双楼煤矿冲击危险区迎采沿空巷道的巷道变形问题,以92606综采工作面为研究对象,采用理论分析的方法研究了爆破切顶护巷技术;并针对92606工作面的实际情况确定了顶板爆破孔深度为3.3~12.6 m,2个炮孔间距要小于等于1 m,切顶效果较好;同时对92606工作面提出了4种防冲控制方案。根据现场情况对其进行对比分析,得出当孔深8 m和6 m,间距0.5 m,在竖直方向上进行爆破的过程中,爆破面下部隅角一般都不存在悬顶,顶板与支架在爆破时一同脱落;这时可以进行顶板的切顶工作,就可以在一定程度上对92606工作面隅角悬顶,以及在沿空巷道方向上的采动形变进行控制。Abstract: In order to solve the problem of roadway deformation of gob-side entry driving in the dangerous area of Zhangshuanglou Coal Mine, taking 92606 working face as the research object, the technology of blasting and roof cutting is studied by means of theoretical analysis, and according to the actual situation of 92606 working face, the depth of roof blasting hole is determined to be 3.3 m to 12.6 m, the distance between two blasting holes is less than or equal to 1 m, and the effect of roof cutting is good. At the same time, four kinds of preventing rock burst control schemes are proposed for 92606 working face. According to the comparison and analysis of the field situation, when the hole depth is 8 m and 6 m, the spacing is 50 cm, and the blasting is carried out vertically and upward, there is basically no suspended roof at the lower corner of the working face, and the roof collapses with the support. Through the roof cutting, the mining deformation of the corner hanging roof and the gob side roadway of 92606 working face are effectively controlled.
-
-
[1] 高玉兵.柠条塔煤矿厚煤层110工法关键问题研究[D].北京:中国矿业大学(北京),2018. [2] 朱珍,张科学,袁红平.切顶卸压沿空留巷碎石巷帮控制技术及应用[J].煤炭科学技术,2018,46(3):25. ZHU Zhen, ZHANG Kexue, YUAN Hongping. Control technology and its application of roadway side wall formed by gangue in gob-side entry retaining formed by roof cutting and pressure releasing[J]. Coal Science and Technology, 2018, 46(3): 25-32.
[3] 何满潮,高玉兵,杨军,等.厚煤层快速回采切顶卸压无煤柱自成巷工程试验[J].岩土力学,2018,39(1):254-264. HE Manchao, GAO Yubing. YANG Jun, et al. Engineering experimentation of gob-side entry retaining formed by roof cutting and pressure release in a thick-seam fast-extracted mining face[J]. Rock and Soil Mechanics, 2018, 39(1): 254-264.
[4] 李文峰,孙迎辉,杨波,等.迎回采面沿空掘巷围岩控制技术实践[J].煤炭工程,2010,41(2):24-26. LI Wenfeng, SUN Yinghui, YANG Bo, et al. Practices on surrounding rock control technology of gateway driv-ingalong goaf towards to coal mining face[J]. Mining Engineering, 2010, 41(2): 24-26.
[5] 赵瑶,王珏,高明仕,等.陈四楼矿迎采动沿空掘巷技术研究及应用[J].煤炭工程,2012,43(6):41-43. ZHAO Yao, WANG Yu, GAO Mingshi, et al. Research and application of gateway driving along goaf forward to adjacent mining coal mining face in chensilou mine[J]. Coal Engineering, 2012, 43(6): 41-43.
[6] 于洋,王襄禹,薛广哲,等. 迎采动工作面沿空掘巷动态分段围岩控制技术[J].煤炭科学技术,2013,41(7):43. YU Yang, WANG Xiangyu, XUE Guangzhe, et al. Dynamic sectional control technology of surrounding rock in gateway driving along goaf forward to mining face[J]. Coal Science and Technology, 2013, 41(7): 43.
[7] 王猛,柏建彪,王襄禹,等.迎采动面沿空掘巷围岩变形规律及控制技术[J].采矿与安全工程学报,2012, 29(2):197-202. WANG Meng, BO Jianbiao, WANG Xiangyu, et al. The surrounding rock deformation rule and control technique of the roadway driven along goaf and heading for adjacent advancing coal face[J]. Journal of Mining & Safety Engineering, 2012, 29(2): 197-202.
[8] 秦海忠.采动影响留巷煤柱内沿空掘巷强力锚网索支护技术[J].煤矿开采,2012,17(2):69-72. QIN Haizhong. Technology of powerful anchored cable and mesh supporting for driving roadway along gob in coal-pillar influenced by mining[J]. Coal mining Technology, 2012, 17(2): 69-72.
[9] 李学华,鞠明和,贾尚昆,等. 沿空掘巷窄煤柱稳定性影响因素及工程应用研究[J].采矿与安全工程学报,2016,33(5):761-769. LI Xuehua, JU Minghe, JIA Shangkun, et al. Study of influential factors on the stability of narrow coal pillar in gob-side entry driving and its engineering application[J]. Journal of Mining & Safety Engineering, 2016, 33(5): 761-769.
[10] 陈正拜,李永亮,杨仁树,等.窄煤柱巷道非均匀变形机理及支护技术[J].煤炭学报,2018,43(7):1847. CHEN Zhengbai, LI Yongliang, YANG Renshu, et al. Non-uniform deformation mechanism and support technology of narrow coal pillar roadway[J]. Journal of China Coal Society, 2018, 43(7): 1847.
[11] 刘增辉,高谦,华心祝,等.沿空掘巷围岩控制的时效特征[J].采矿与安全工程学报,2009,26(4):75-79. LIU Zenghui, GAO Qian, HUA Xinzhu, et al. Aging characteristics of wall rock control in roadway driving along goaf[J]. Journal of Mining & Safety Engineering, 2009, 26(4): 75-79. [12] 郑西贵,姚志刚,张农.掘采全过程沿空掘巷小煤柱应力分布研究[J].采矿与安全工程学报,2012,29(4):459. ZHUANG Xigui, YAO Zhigang, ZHANG Nong. Stress distribution of coal pillar with gob-side entry driving in the process of exca-vation and mining[J]. Journal of Mining & Safety Engineering, 2012, 29(4): 459.
[13] 黄炳香,刘长友,王美柱,等.提高综放工作面端头煤层放出率的试验[J].煤炭科学技术,2010,38(3): 1-4. HUANG Bingxiang, LIU Changyou, WANG Meizhu, et al. Test to improve top coal caving rate at face end of fully mechanized top coal caving mining face[J]. Coal Science and Technology, 2010, 38(3): 1-4.
[14] 王傲,姚强岭,李学华,等.采动高应力区沿空掘巷锚杆破断机理[J].中国矿业大学学报,2017,46(4):769-775. WANG Ao, YAO Qiangling, LI Xuehua, et al. Bolt fracture mechanism of roadway driven along gob in high street area caused by mining[J]. Journal of China University of Mining & Technology, 2017, 46(4): 769-775.
[15] 付书俊,吴乐,何杰.近距离煤层迎采动工作面沿空掘巷支护技术[J].煤炭工程,2019,51(6):81-85. FU Shujun, WU Le, HE Jie, Gob-side entry driving heading adjacent advancing coal face in the close coal seam[J]. Coal Engineering, 2019, 51(6): 81-85.
[16] 张农,李学华,高明仕.迎采动工作面沿空掘巷预拉力支护及工程应用[J].岩石力学与工程学报,2004, 23(12):2100-2105. ZHUANG Nong, LI Xuehua, GAO Mingshi, Pretensioned support of roadway driven along next gob and heading adajacent advancing coal face[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(12): 2100-2105.
计量
- 文章访问数: 29
- HTML全文浏览量: 0
- PDF下载量: 0