Abstract:
In view of the current outburst prevention and prediction technology, it is difficult to realize the advance prediction of coal and gas outburst risk and timely release of disasters. Based on the deep analysis of the regional and local “four in one” comprehensive outburst prevention measures, this paper constructs the mine outburst prevention information prediction equipment system from the aspects of prediction technology, sampling method, outburst prevention information management, etc. At the same time, combined with the dual architecture mode of C/S and B/S, a set of mine outburst information management and control system platform is designed and developed for high gas outburst mine. The application results of a mine in Yangmei Group show that the technology system can save outburst prediction time to a large extent, improve the accuracy and approval efficiency of outburst prediction results, and solve the technical problems that the traditional prediction technology is difficult to achieve the prediction and timely release of outburst disasters. The technology system realizes the centralized and information-based management and control of the whole process of mine outburst prevention, and promotes the safe and efficient management of outburst prevention.