补连塔煤矿大采高工作面覆岩运移规律

    Law of Overlying Strata Movement in Large Mining Height Working Face of Bulianta Coal Mine

    • 摘要: 为实现补连塔矿12511大采高工作面在白垩系下统志丹群含水层下安全开采,采用地面施工下行钻孔进行钻孔冲洗液漏失量观测与彩色钻孔电视观测相结合的方法,开展近浅埋煤层大采高工作面覆岩运移规律实测研究。研究结果表明,工作面中部1#观测孔导水裂缝带高度为104.48 m,垮落带高度为33.70 m;工作面煤巷侧2#观测孔导水裂缝带高度为122.90 m,垮落带高度为37.40 m。工作面覆岩“两带”分布呈现两帮高、中间低的规律。

       

      Abstract: In order to realize the safe mining under cretaceous Klzd aquifer of 12511 large mining hight working face of Bulianta Coal Mine, the method combining the observation of the loss of drilling fluid and the observation of color drilling television is adopted through using ground construction downward drilling to carry out the actual measurement research on the overlying strata movement law of the large mining height working face near the shallow seam. The research results show that the height of the water-conducting fracture zone of the 1# observation hole in the middle of the working face is 104.48 m, and the height of the caving zone is 33.70 m. The height of the water-conducting fracture zone of the 2# observation hole of the working face is 122.90 m, and the height of the fall zone is 37.40 m. The distribution of the “two bands” of the overburden of the working face presents the rule of two sides high and middle low.

       

    /

    返回文章
    返回