气动式底板钻机多相耦合排渣机理及应用

    Multiphase Coupling Deslagging Mechanism and Application of Pneumatic Floor Drilling Machine

    • 摘要: 针对气动式钻机在煤矿巷道底板排渣效率低、成孔困难的问题,基于两相流态变化进行了气-液-固多相耦合排渣机理分析,并从钻渣运移动力路径的角度对成孔困难原因进行阐释。结果表明:在底板水影响下,孔内先后经历“静态-泡状流-段塞流-环空雾流”等两相流态,约75%的钻渣在泡状流与段塞流阶段以较快速率排出,剩余钻渣需在环空雾流阶段以较低效率缓慢排出;底板水侵蚀引发的孔口外扩是成孔困难的主要原因。结合益新煤矿-250机道石门底板锚固工程实际,提出了“套管束流”排渣法并优化了原钻孔工艺,现场应用效果良好。

       

      Abstract: In view of low slag discharge efficiency and hole-forming difficulty problem of pneumatic drilling machine in coal mine roadway floor, multiphase flow pattern change in drill-hole during slag discharge process has been analyzed based on two-phase flow pattern change. Meanwhile, reasons that cause hole-forming difficulty have been analyzed from the point of moving force path of drilling slag. The results show that two-phase pattern change, such as “static - bubble flow - slug flow - annular fog flow” were successively experienced in the hole, about 75% of drilling slag is discharged at a faster rate during the bubble and slug flow stages, while the remaining drilling slag should be discharged slowly in the stage of annular fog flow with low efficiency; external expansion of drill-hole caused by water erosion is the main factor leading to drilling failure. Based on the engineering practice of -250 cross-hole in Yixin Coal Mine, the “casing beam” deslagging method is proposed correspondingly and the original drilling technique is optimized, and the field application effect is good.

       

    /

    返回文章
    返回