基于充水条件比拟的工作面涌水量预计方法

    Prediction Methods of Water Inflow in Coal Face Based on Comparison of Water-filled Conditions

    • 摘要: 针对蒙陕矿区纳林河二号矿井水文地质条件复杂、防排水系统布设困难等问题,开展了工作面涌水量预计方法研究。在对矿井31121工作面充水水源、充水通道和充水强度深入分析研究的基础上,分别采用大井法、单宽流量法和水文地质综合比拟法对工作面涌水量进行了动态预计,并对各方法和预计结果进行了对比研究。结果表明:水文地质综合比拟法的涌水量预计结果较为准确,可作为该工作面防排水系统建设的依据,以保障工作面安全回采。

       

      Abstract: In view of the complex hydrogeological conditions and the difficulty in the arrangement of drainage and prevention systems in Nalinhe No. 2 mine in the bordering area of Inner Mongolia and Shanxi Province, the method for predicting the water inflow in the working face is studied. Based on the deep analysis and research on the water-filled source, water-filled channel and water-filled strength of 31121 working face of the mine, the dynamic prediction of water-filled amount of the working face is carried out by using big well method, single wide flow method and hydrogeological comprehensive comparison method respectively, and a comparative study is carried out on the methods and predicted results. The results show that the water inflow prediction results based on hydrogeological comprehensive comparison method are most accurate, which can be used as the basis for the construction of the water drainage systems in the coal faces to ensure the coal safety recovery.

       

    /

    返回文章
    返回