    • 摘要: 为了对开拓巷道前方和回采工作面内部导含水构造进行有效的超前探测,基于现有的瞬变电磁探测技术,通过设计回采工作面和巷道掘进工作面定点的三维瞬变电磁超前探测技术,采用物理模拟方法对煤矿中典型的断层和陷落柱等导含水构造进行模拟研究,结果显示:这些典型导含水构造的空间范围和形态能够较准确的显示在三维立体图中。对平朔集团有限公司井工一矿19108工作面内部隐伏陷落柱进行了实地探测,验证结果表明:通过合理的设计三维探测角度,工作面内部的陷落柱能够在三维异常空间中准确地显示出来。

       

      Abstract: In order to effectively detect the internal water-conducting structure in front of the open roadway and the mining face, based on the existing transient electromagnetic detection technology, three-dimensional transient electromagnetic advance detection technology is designed for stope face and tunneling face, the typical water-bearing structures such as fault and collapse column in the coal mine are simulated by physical simulation method. The results show that the spatial range and morphology of these typical conductive water-bearing structures can be accurately displayed in the three-dimensional diagram. The in-situ detection of concealed collapse columns in 19108 working face of Pingshuo Mine Group proves that the collapse column inside the working face can be accurately displayed in the 3D abnormal space through the reasonable design of three-dimensional detection angle.

       

    /

    返回文章
    返回