    Implementation Plan of Bulianta Coal Mine Heading Face Passing Through CCS Project Drilling

    • 摘要: 为了使补连塔煤矿12515回风煤巷掘进工作面安全通过原神华煤制油CCS项目钻孔,深入分析了CCS项目钻孔的危害及其对12515回风巷掘进作业的影响,通过采取全方位气体监测、超前钻探、补强支护、应急处置等措施,使掘进工作面安全顺利通过钻孔,证实了所采取的过钻孔方案的可行性。

       

      Abstract: In order to make the heading face of Bulianta Coal Mine 12515 return airway safely pass through the drilling of original Shenhua coal liguifaction CCS project, the harm of the drill hole of CCS project and its influence on the heading operation of 12515 return airway are analyzed in depth, and the measures such as the omnidirectional gas monitoring, the advance drilling, the reinforcement support and the emergency disposal are taken. In order to make the heading face safely and smoothly pass through the drilling, the feasibility of the adopted drilling scheme was confirmed.

       

    /