• 中文核心期刊
  • 中国科技核心期刊
  • RCCSE中国核心学术期刊

高水平应力软岩巷道预留刚隙柔层支护技术

朱士永

朱士永. 高水平应力软岩巷道预留刚隙柔层支护技术[J]. 煤矿安全, 2018, 49(11): 84-87.
引用本文: 朱士永. 高水平应力软岩巷道预留刚隙柔层支护技术[J]. 煤矿安全, 2018, 49(11): 84-87.
ZHU Shiyong. Support Technology of Reserved Rigid Gap Flexible Layer in High Horizontal Stress Soft Rock Roadway[J]. Safety in Coal Mines, 2018, 49(11): 84-87.
Citation: ZHU Shiyong. Support Technology of Reserved Rigid Gap Flexible Layer in High Horizontal Stress Soft Rock Roadway[J]. Safety in Coal Mines, 2018, 49(11): 84-87.

高水平应力软岩巷道预留刚隙柔层支护技术

Support Technology of Reserved Rigid Gap Flexible Layer in High Horizontal Stress Soft Rock Roadway

  • 摘要: 为解决某矿运输巷大变形、强流变的工程难题,通过对巷道地应力、围岩松动范围、变形破坏特征及岩层力学状态进行分析,总结了其大变形失稳破坏的原因;基于“定量让压”支护理论,提出了“多级锚网索+预留刚隙柔层+U型钢强力支护”联合控制技术,并采用FLAC3D模拟确定了刚隙柔层最佳预留空间大小。工业性试验表明,采用该支护技术后围岩顶板下沉量、底鼓量及两帮移近量分别为37.8、97.8、105.3 mm,顶板及帮部锚杆轴力分别在80~112 kN和78~137 kN范围内,有效解决了该运输巷蠕变大变形的工程难题。
    Abstract: In order to solve the engineering problem of large deformation and strong rheological behavior of a coal mine transportation roadway, the causes of large deformation instability and failure of roadway are summarized by the analysis of the ground stress test, the loose range of surrounding rock, the deformation and failure characteristics and the mechanical state of rock stratum. Based on the support theory of quantitative pressure, this paper proposes a joint support scheme of multi-stage anchor cable + reserved rigid gap flexible layer +U beam strong support. The optimal reserved space of rigid gap flexible layer was determined by FLAC3D simulation. The industrial test shows that the maximum subsidence, floor heave and two sides moving amount of roadway roof are respectively 37.8 mm, 97.8 mm and 105.3 mm; the bolt axial force are in the range of 80 kN to 112 kN at roof and 78 kN to 137 kN at two sides after adopting the supporting technology, which effectively solves the engineering problem of large creep deformation of the transportation lane.
  • [1] 罗吉安,王连国,侯化强.高应力软岩巷道预留刚隙柔层支护技术[J].煤矿安全,2012,43(8):210-213.
    [2] 李冲,徐金海,李明,等.深井软岩巷道预留刚隙柔层厚度的确定及应用[J].中国矿业大学学报,2011,40(4):505-510.
    [3] 王树仁,刘招伟,屈晓红,等.软岩隧道大变形力学机制与刚隙柔层支护技术[J].中国公路学报,2009,22(6):90-95.
    [4] 刘传波.预留刚隙柔层软岩支护技术探讨[J].江西煤炭科技,2007(4):92-93.
    [5] 罗勇.深井软岩巷道U型钢支架壁后充填技术研究[J].力学季刊,2009,30(3):488-494.
    [6] 胡艳峰,谢文兵,赵晨光,等.U型钢可缩性支架壁后充填应力分散技术研究[J].煤炭工程,2007(7):66.
    [7] 王悦汉,陆士良.壁后充填对提高巷道支护阻力的研究[J].中国矿业大学学报,1997(4):3-5.
    [8] 浑宝炬,陈晓坡.林南仓矿软岩巷道壁后充填支护技术[J].煤矿安全,2014,45(2):123-126.
    [9] 王彩根,王悦汉.整体壁后充填对提高拱形金属支架支护阻力的作用[J].中国矿业大学学报,1994(1):1.
    [10] 蔡美峰,何满潮,刘东燕.岩石力学与工程[M].北京:科学出版社,2014.
计量
  • 文章访问数:  104
  • HTML全文浏览量:  0
  • PDF下载量:  0
  • 被引次数: 0
出版历程
  • 发布日期:  2018-11-19

目录

    /

    返回文章
    返回