Abstract:
Watery abnormal areas in Cambrian limestone aquifer is defined based on underground transient electromagnetic method and DC electrical method in western roadway of Pingmei No.8 coal mine.Combined with features of geothermal gradient and aquifuge thickness from coal floor of Ji-group to limestone roof of Cambrian,seven boreholes with depth of 150 m for dredging and draining geothermal water of Cambrian limestone are designed and constructed in coal floor of western roadway.The total water inflow of these seven bores is 300 m
3 / h and the temperature of emission geothermal water reaches 50 ℃.The result of dredging and draining makes the water bursting dangerous region with the inrush coefficient more than 0.06 MPa / m in No.8 coal mine decrease to 5 480 m