• 中文核心期刊
  • 中国科技核心期刊
  • RCCSE中国核心学术期刊

孤岛综放工作面沿空掘巷窄煤柱留设宽度优化设计

姚博, 康天合, 尹博

姚博, 康天合, 尹博. 孤岛综放工作面沿空掘巷窄煤柱留设宽度优化设计[J]. 煤矿安全, 2018, 49(6): 130-134.
引用本文: 姚博, 康天合, 尹博. 孤岛综放工作面沿空掘巷窄煤柱留设宽度优化设计[J]. 煤矿安全, 2018, 49(6): 130-134.
YAO Bo, KANG Tianhe, YIN Bo. Width Optimization of Narrow Coal Pillar of Gob-side Entry Driving in Isolated Fully Mechanized Caving Face[J]. Safety in Coal Mines, 2018, 49(6): 130-134.
Citation: YAO Bo, KANG Tianhe, YIN Bo. Width Optimization of Narrow Coal Pillar of Gob-side Entry Driving in Isolated Fully Mechanized Caving Face[J]. Safety in Coal Mines, 2018, 49(6): 130-134.

孤岛综放工作面沿空掘巷窄煤柱留设宽度优化设计

Width Optimization of Narrow Coal Pillar of Gob-side Entry Driving in Isolated Fully Mechanized Caving Face

  • 摘要: 为了解决孤岛综放工作面沿空掘巷矿压显现剧烈、巷道围岩控制困难的难题,运用理论计算、数值模拟及现场实测的方法,研究了孤岛综放工作面回采巷道在不同宽度窄煤柱条件下的围岩稳定状况。基于采空区侧煤体支承压力分布特征以及沿空掘巷的力学模型,分别从内应力场和极限平衡理论角度计算分析,确定了护巷窄煤柱留设宽度的合理尺寸范围为4.46~7.3 m。采用数值模拟方法对窄煤柱留设尺寸进行了对比分析,得到3204孤岛综放工作面护巷窄煤柱的最优尺寸为5 m。现场监测数据表明:3204工作面回风巷道两帮的最大变形量为147 mm,顶底板最大变形量为95 mm,能够满足安全生产要求。
    Abstract: In order to solve problems of the severe strata pressure characteristics of the gob-side entry driving and the difficulty in controlling roadway surrounding rock in the isolated fully mechanized caving face, the surrounding rock stability of roadway at isolated fully mechanized caving face under the condition of different width coal pillars was studied based on the theory analysis, numerical simulation and practice method. Based on the abutment pressure distribution regularities combined with the structural mechanical model of roadway driving along goaf, calculating and analyzing respectively from internal stress field and limit equilibrium theory, it is determined that the reasonable width of narrow coal pillar is between 4.46 m and 7.3 m. Using numerical simulation method, the size of narrow coal pillar is compared and analyzed, and the optimal size of narrow coal pillar is 5 m. Field monitoring indicated that the maximum deformation amount of the two sides of the roadway in the working face of 3204 is 147 mm, and the maximum deformation amount of the top and bottom is 95 mm, which can meet the requirements of safety production.
  • [1] 柏建彪.沿空掘巷围岩控制[M].徐州:中国矿业大学出版社,2006.
    [2] 杨科,谢广祥,常聚才.煤柱宽度对巷道围岩稳定性影响分析[J].地下空间与工程学报,2009(5):991-995.
    [3] 刘长友,黄炳香,孟祥军,等.超长孤岛综放工作面支承压力分布规律研究[J].岩石力学与工程学报,2007, 26(增1):2761-2768.
    [4] 华心祝,刘淑,刘增辉,等.孤岛工作面沿空掘巷矿压特征研究及工程应用[J].岩石力学与工程学报,2011, 30(8):1646-1651.
    [5] 张炜,张东升,陈建本,等.孤岛工作面窄煤柱沿空掘巷围岩变形控制[J].中国矿业大学学报,2014,43(1):36-42.
    [6] 宋振骐.实用矿山压力与控制[M].徐州:中国矿业大学出版社,1988:122-130.
    [7] 谢广祥,杨科,刘全明.综放面倾向煤柱支承压力分布规律研究[J].岩石力学与工程学报,2006,25(3):545-549.
    [8] 李磊,柏建彪,王襄禹.综放沿空掘巷合理位置及控制技术[J].煤炭学报,2012,37(9):1564-1569.
    [9] 贾光胜,康立军.综放开采采准巷道护巷煤柱稳定性研究[J].煤炭学报,2002,27(1):6-10.
    [10] 钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003:218-226.
计量
  • 文章访问数:  148
  • HTML全文浏览量:  0
  • PDF下载量:  0
  • 被引次数: 0
出版历程
  • 发布日期:  2018-06-19

目录

    /

    返回文章
    返回