Abstract:
This article introduces the development course and planning measures of the construction of digital mine in Shendong Coal Group, and it’s development status of digital mine construction is investigated and studied in detail. The results show that the current construction of Shendong digital mine is limited in a few fields, and it does not cover the whole process management of coal mine safety, production and operation. According to the research results, the significance of accelerating the construction of digital mine of Shendong Coal Mine is proposed, and the corresponding suggestions and measures are proposed.