软弱煤层综放沿空留巷充填体参数实验研究

    Experimental Study on Parameters of Filling Body of Gob-side Entry Retaining in Fully-mechanized Top-coal Caving Mining Face of Soft Coal Seam

    • 摘要: 针对埋藏深、煤层厚及软弱煤质的极端条件,研究分析了巷旁充填体宽度对综采放顶煤沿空留巷效果的影响。以王庄煤矿7101工作面风巷为工程背景,利用大比例试验台选取2~3 m 11种不同宽度的充填体进行相似模拟实验,通过分析各测点的应力和位移数据,确定充填体宽度为2.5 m时留巷效果最好。通过实验分析得出充填体和综放煤巷围岩的相互作用可分为活动前期、活动过渡期和活动后期3个时期。

       

      Abstract: According to the special conditions in the deep and thick soft coal seam, the influence of different width of filling body beside the lane on the effect of gob-side entry retaining in the fully-mechanized top-coal caving mining was studied. In the engineering background of the wind lane in Wangzhuang Coal Mine 7101 working face, analog simulation experiments were done in the large scale test rig by selecting 11 different width of the backfilled wall from 2 m to 3 m. Through the analysis of the stress and displacement of each measuring point data, the width of filling body was determined to be 2.5 m with regard to the best effect of the left lane. Through the experiment analysis, the interaction between the filling body and the surrounding rock of the fully-mechanized top-coal caving mining coal roadway is divided into three stages: the early stage of the activity, the transition stage of the activity and the late stage of the activity.

       

    /

    返回文章
    返回